Laserfiche WebLink
W A T E R E N E R G Y l i F E <br /> RIVERSIDE PUBLIC UTILITIES <br /> a W& Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: November 2, 2012 <br /> ITEM NO: 10 <br /> SUBJECT: CONSTRUCTION OF THE COONEN DRIVE 8-INCH DISTRIBUTION MAIN <br /> REPLACEMENT PROJECT—WORK ORDER NO. 1201978 <br /> ISSUE: <br /> That the Board of Public Utilities consider approval of the capital expenditure in the amount of <br /> $1,673,000 to construct the Coonen Drive 8-Inch Distribution Main Replacement Project. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the capital expenditure of $1,673,000 for Work Order No. <br /> 1201978 which includes all design, construction, and paving costs for the Coonen Drive 8-Inch <br /> Distribution Main Replacement Project. <br /> BACKGROUND: <br /> The construction of the Coonen Drive 8-Inch Distribution Main Replacement Project is part of Riverside <br /> Public Utilities Department's (RPU) on-going water main replacement program to replace old and high <br /> priority leaky mains. The project area consists of existing 6-inch steel water mains that were installed in <br /> the 1950's and have experienced approximately 50 leaks, of which 21 have occurred in the last five <br /> years. The work will entail the construction of approximately 5,600 linear feet of eight-inch ductile iron <br /> pipe, 14 fire hydrants, 114 service tie-avers, and 11 system connections. The work identified will be <br /> constructed by RPU Water Division field forces. <br /> Once the new water pipelines are installed, RPU will be responsible for standard trench repaving per the <br /> Public Works standard. Near the end of pipeline construction, staff will solicit paving bids for paving the <br /> trench area from RPU's Paving Contractor Panel. A budgetary estimate for the paving work has been <br /> included in this authorization. <br /> FISCAL IMPACT: <br /> The total capital expenditure for Work Order No. 1201978 is estimated to be $1,673,000 which includes <br /> all design, construction, paving, contract administration and inspection costs necessary to perform the <br /> work, as summarized in the following table: <br /> Description Cost Percent of Total <br /> Design/Survey/Potholing $65,000 3.9% <br /> Construction (City Forces) $1,008,000 60.2% <br /> Construction Contingency $100,000 6.0% <br /> Paving Budget $500,040 29.9% <br /> Total $1,673,000 100% <br /> Sufficient funds are available in the Public Utilities' Water Main Replacement Account No. 6230000- <br /> 470707. <br />