Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2012 BPU
>
11-02-12
>
11-02-12 BPU RPT 05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2015 9:18:09 AM
Creation date
9/30/2015 9:18:04 AM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
11-02-2012 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2012 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: November 2, 2012 <br /> ITEM NO: 5 <br /> SUBJECT: CIRCUIT 1551 SWITCH, CAPACITOR AND JUNCTION CABINET INSTALLATION <br /> WORK ORDER NO. 1204535 <br /> ISSUE: <br /> Board of Public Utilities approval is requested for Work Order No. 1204535. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of $284,768 to install a <br /> padmount switch, capacitor, and junction cabinet to improve system reliability on Circuit 1551 in the <br /> Orangecrest neighborhood. <br /> BACKGROUND: <br /> Consistent with the recommendations in Riverside Public Utilities' (RPU) Electric System Master Plan for <br /> system reliability, staff has targeted Circuit 1551 located in the Orangecrest neighborhood for <br /> replacement of an underground aging oil switch. This project will include intercepting existing <br /> underground infrastructure and the installation of three pad-mounted structures. This project is part of <br /> RPU's efforts to improve operational efficiencies as underground operable equipment is replaced with <br /> above ground, pad-mounted equipment. All pad-mounted equipment will be installed with consideration <br /> given to the surrounding aesthetics. <br /> Engineering was performed by RPU staff and electrical work will be performed by RPU field forces. Civil <br /> construction will be performed by contract crews from the RPU Contractor's Panel. <br /> FISCAL IMPACT: <br /> The capital expenditure for Work Order No. 1204535 is estimated to be $284,768 and is detailed as <br /> follows: <br /> % of Total <br /> Construction Contract- Electric Conduit& Structures $111,606 39% <br /> Contingency $11,161 4% <br /> Construction & Electrical Equipment- RPU $95,726 34% <br /> Design, Construction Mana ement, Inspection $66,275 23% <br /> Total $284,768 100% <br /> Sufficient funds are available in the Electric Capital Account No. 6130000-470601. <br />
The URL can be used to link to this page
Your browser does not support the video tag.