W A 7 r= R E N E 4 G Y 1. 1 <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> P 0 B L I C UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: November 2, 2012 <br /> ITEM NO: 4 <br /> SUBJECT: CIRCUIT 1501 SWITCH REPLACEMENT PROJECT -WORK ORDER NO. 1305515 <br /> ISSUE: <br /> Board of Public Utilities approval is requested for Work Order No.1305515, <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of $133,000 for Work Order <br /> No. 1305515 to install a switch, conduits, and other substructures on Tyler Street which will replace <br /> damaged inoperable equipment necessary for load transfers. <br /> BACKGROUND: <br /> During routine maintenance, gas switch GS3-187 was removed in June 2012, after four years of <br /> inoperability. The switch was located inside vault V1258 and served half of the load of the Tyler Galleria <br /> Mall. As an emergency repair, all cables were spliced bypassing the switch, thereby decreasing the <br /> system's reliability and ability to isolate load where needed. <br /> The proposed project will improve Riverside Public Utilities' (RPU) ability to isolate load in that area and <br /> improve system reliability. The proposed project involves the installation of 677 feet of conduit, 1,152 <br /> feet of underground cable, one padmounted switch with enclosure (PSE), and one commercial <br /> subsurface transformer enclosure. The relocated structures were designed with consideration given to <br /> the surrounding aesthetics (Attachment 1). <br /> Engineering was performed by RPU staff and electrical work will be performed by RPU field forces. Civil <br /> construction will be performed by contract crews from the RPU Contractor's Panel. <br /> FISCAL IMPACT: <br /> The capital expenditure for Work Order No. 1305515 is estimated to be $133,000 and is detailed as <br /> follows: <br /> % of <br /> Total <br /> Design, Construction Management, Inspection $5,300 4% <br /> Construction Contract- Conduits & Substructures $37,040 28% <br /> Contingency $3,700 3% <br /> Construction RPU Field Forces $67,000 50% <br /> Easement $20,000 15% <br /> Total $133,000 100% <br /> Sufficient funds are available in the Electric Capital Account No. 6130000-470603. <br />