W R I E R E N E R G Y L I F E <br /> L3 id& RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: October 5, 2012 <br /> ITEM NO: 7 <br /> SUBJECT: REHABILITATION OF DETERIORATED VAULTS AND ASSOCIATED EQUIPMENT ON <br /> CHICAGO AVENUE BETWEEN SPRUCE STREET AND MARLBOROUGH AVENUE <br /> WORK ORDER NO. 1129993 <br /> ISSUE: <br /> Board of Public Utilities approval is requested for Work Order No. 1121193. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of$647,520 for Work Order No. <br /> 1121193 to rebuild four deteriorated vaults, one pull box and replace associated equipment. <br /> BACKGROUND: <br /> Vaults V2805, V2838, V2840 and V2909 were installed in 1978 and 1979 in Chicago Avenue between <br /> Spruce Street and Marlborough Avenue,just south of Riverside Public Utilities(RP U)H unter S ubstation. The <br /> Asset Management and Inspection Program discovered that these vaults had serious deterioration with heavy <br /> cracks and decomposed concrete in the ceiling and walls. These vaults contain critical infrastructure, <br /> including one to four 12 kV circuits out of Hunter Substation, local 12 kV distribution cables serving some 32 <br /> office and industrial buildings along Chicago Avenue, and switching devices. <br /> The scope of the work involves installing new 12 kV distribution infrastructure and installing two pad mounted <br /> switches to enable the removal of a deteriorated underground oil switch. This work will enable contractor <br /> forces to structurally rebuild these vaults. The pad-mounted equipment will be installed with consideration <br /> given to the surrounding esthetics. <br /> Engineering was performed by the Engineering Panel and the construction will be performed by Riverside <br /> Public Utilities field forces and contractor crews from the Contractors' Panel. <br /> FISCAL IMPACT: <br /> The total project cost is estimated at$647,520. The breakdown is as follows: <br /> Description Amount %of Total <br /> Consultant Design—G.0. 165 Consultants' Panel $38,705 6% <br /> Contract Construction— Sub-Structures $361,534 56% <br /> City Construction of Cabling& Equipment $182,533 28% <br /> Contingency, including Change Order Authorization $64,752 10% <br /> Total $647,520 100% <br /> Sufficient funds are available in the GO 165 Line Rebuilds Account No. 6130000-470623 ($621,619)and <br /> Cable Replacement Account No. 6130000.470635($25,901). <br />