Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2012 BPU
>
10-05-12
>
10-05-12 BPU RPT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2015 4:34:46 PM
Creation date
9/29/2015 4:25:53 PM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
10-05-2012 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2012 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E R £ R G Y i i F <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: October 05, 2012 <br /> ITEM NO: 6 <br /> SUBJECT: OVERHEAD LINE RELOCATION PROJECT FOR RYAN BONAMINIO PARK AT THE <br /> TEDUESOUITE ARROYO-WORK ORDER NO. 1110587 <br /> ISSUE: <br /> Board of Public Utilities approval is requested for Work Order No. 1110587. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of $1,010,000 for Work Order <br /> No. 1110587 to relocate and reconfigure existing 69 kV overhead facilities to accommodate the <br /> construction of the Ryan Bonaminio Park at the Tequesquite Arroyo improvements. <br /> BACKGROUND: <br /> There is an existing overhead 69 kV wood pole line near Tequesquite Avenue, northerly of Palm Avenue, <br /> which bisects the open space proposed for the new Ryan Bonaminio Park at the Tequesquite Arroyo <br /> (Project). The work proposed will consist of relocation of the 69 kV wood pole line out of the proposed <br /> Project, acquisition of any necessary easements, and installation of approximately 10,500 linear feet of <br /> Aluminum Conductor Composite Core Cable (ACCC). <br /> As illustrated in the attachment, the existing 69 kV wood pole line crosses diagonally over City property <br /> and in an open field. The line is not within an existing easement area and instead is co-located on City <br /> property. The line will be relocated to the street right-of-way in order to avoid interference with the <br /> improvement of the property for the Project, as the operation of the Park could interfere with proper <br /> maintenance and operation of the 69 kV line. <br /> ACCC cable incorporates advanced technologies resulting in lighter weight cable, increased current <br /> carrying capabilities, and enhanced strength over traditional 69 kV aerial conductors. Consistent with the <br /> Riverside Public Utilities' (RPU) Strategic Plan goal to maximize the use of technology to improve utility <br /> operations, staff has recommended this new cable type be used on this project. <br /> Engineering was performed in collaboration with RPU staff and a consultant from the Consultant's Panel. <br /> Electrical work will be performed by RPU field forces. Civil construction will be performed by contract <br /> crews from the Contractor's Panel. <br /> FISCAL IMPACT: <br /> The capital expenditure for the project is estimated to be $1,010,000 and is as follows: <br /> % of Total <br /> Construction Contract-Civil Work $115,596 12% <br /> Construction RPU-Electric Overhead $730,559 72% <br /> Design, Permits, Construction Management, <br /> Ins ection $72,027 7% <br /> Contingency 10% $911818 9% <br /> Subtotal: $1,010,000 100% <br /> Sufficient funds are available in the Major Transmission Line Project Account No. 6130000-470620. <br />
The URL can be used to link to this page
Your browser does not support the video tag.