Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2012 BPU
>
10-05-12
>
10-05-12 BPU RPT 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2015 4:34:15 PM
Creation date
9/29/2015 4:24:07 PM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
10-05-2012 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2012 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y l [ f <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: October 5, 2012 <br /> ITEM NO: 3 <br /> SUBJECT: INSTALLATION OF PAD-AMOUNTED JUNCTION CABINET AND CAPACITOR ON <br /> CIRCUIT 1530 -WORK ORDER NO. 1305987 <br /> ISSUE., <br /> Board of Public Utilities approval is requested for Work Order No. 1305987. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of $122,279 to install a pad- <br /> mount capacitor and junction cabinet for system reliability purposes on Circuit 1530 in the Orange Crest <br /> neighborhood. <br /> BACKGROUND: <br /> Consistent with the recommendations in Riverside Public Utilities' (RPU) Electric System Master Plan for <br /> system reliability, staff has targeted Circuit 1530 located in the Orange Crest neighborhood for power <br /> factor improvement. This project will include intercepting existing underground infrastructure and the <br /> installation of two pad-mounted structures. All pad-mounted equipment will be installed with <br /> consideration given to the surrounding aesthetics. <br /> Engineering was performed by RPU staff and electrical work will be performed by RPU field forces. Civil <br /> construction will be performed by contract crews from the RPU Contractor's Panel. <br /> FISCAL IMPACT, <br /> The capital expenditure for the project is estimated to be $122,279 and is as follows: <br /> % of <br /> Total <br /> Construction-Electric Conduit 8 Structures $51,011 50% <br /> Contingency 10% $6,101 5% <br /> Construction-Electric Overhead and Underground $42,638 35% <br /> Design, Construction Management, Inspection $12,529 10% <br /> Subtotal: $122,279 100% <br /> Sufficient funds are available in the Capital Account No. 6130000-470601- <br />
The URL can be used to link to this page
Your browser does not support the video tag.