Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2012 BPU
>
09-21-12
>
09-21-12 BPU RPT 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2015 4:03:16 PM
Creation date
9/29/2015 3:37:07 PM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
09-21-2012 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2012 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R 5 Y <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: September 21, 2012 <br /> ITEM NO: 3 <br /> SUBJECT: REPLACEMENT OF DETERIORATED OIL SWITCH AND ASSOCIATED EQUIPMENT <br /> WORE{ ORDER NO. 1120263 <br /> ISSUE: <br /> Board of Public Utilities approval is requested for Work Order No. 1120263, <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of$134,000 for Work Order No. <br /> 1120263 to replace deteriorated oil switch OS3-121 and associated equipment in Vault V-4113 with pad <br /> mounted equipment. <br /> BACKGROUND: <br /> Vault V-4113 was installed in 1988 on Magnolia Avenue southerly of La Sierra Avenue. A detailed inspection <br /> on May 18,2010 determined that OS3-121 located in V-4113 is badly corroded and should be replaced. The <br /> project includes: Installation of one pad mounted switch to replace deteriorated oil switch OS3-121; and <br /> Installation of one pad mounted junction cabinet to replace load break junctions in V-4113 <br /> Engineering was performed by the General Order (GO) 165 Consultants' Panel. Civil construction work <br /> including trenching, conduits, and other infrastructure work will be performed by contract crews from the <br /> Contractors' Panel. Directional boring may be used, if possible, to reduce the amount of street repairs <br /> needed. All electrical work including cable installation, splicing and terminations will be done performed by <br /> Public Utilities field forces. All pad-mounted equipment will be installed with consideration given to the <br /> surrounding esthetics. <br /> FISCAL IMPACT: <br /> The capital expenditure for the project is estimated to be $133,492.22 and is as follows: <br /> Percent of <br /> Total <br /> Consultant Design—G.0. 165 Consultants' Panel $11,289.00 8.4% <br /> Contract Construction— Sub-Structures $53,794.06 40.3% <br /> City Construction of Cabling & Equipment $56,273.50 42.2% <br /> Contingency, including change order authorization $12,135.66 9.1% <br /> Total 1 $133,492.22 100.0% <br /> Sufficient funds are available in the System Improvements Account No. 6130000-470623. <br />
The URL can be used to link to this page
Your browser does not support the video tag.