Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2012 BPU
>
07-20-12
>
07-20-12 BPU RPT 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2015 11:38:46 AM
Creation date
9/29/2015 11:38:34 AM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
07-20-2012 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2012 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
L3RIVERSIDE PUBLIC UTILITIES <br /> 19& <br /> PUBLIC UTILITIES Board Memorandum <br /> BOARD OF PUBLIC UTILITIES DATE: July 20, 2012 <br /> DIRECTOR'S REPORT <br /> ITEM NO: 20 <br /> SUBJECT: MONTHLY POWER SUPPLY REPORT- May 2012 <br /> POWER USAGE <br /> Total load requirements (including losses) during May 2012 were 162,491 MWh and 17,593 MWh of <br /> purchases from the CAISO, of which 144,898 MWh were provided by our resources and other <br /> purchases. The retail customer load for May 2012 (159,189 MWh) was 1.9% higher than the retail <br /> customer load in May 2011 (156,258 MWh). The actual peak system demand was 422 MW, compared <br /> to actual peak system demand of 380 MW last year. Energy returns were 0 MWh and 2,883 MWh were <br /> attributed to losses (4.66%). Green power supplied approximately 8.75% of our retail energy <br /> requirements. <br /> The City's generation resources were available during the month as follows: <br /> UNIT OPERATION <br /> IPP: I P P units 1 and 2 operated at 28.98° capacity factor for the month. <br /> PVNGS: Palo Verde units 1, 2 and 3 operated at 98.01% capacity factor for the month. <br /> SONGS: Bath SONGS units 2 and 3 operated at 0% capacity factor for the month. <br /> Hoover: 100% of RVSD's entitlement was met as compared to WAPA's Master Schedule (dated <br /> 6116111). <br /> Clearwater: Clearwater's availability was 97.18%for the month. <br /> RERC: RERC Station (Units 1,2,3 and 4) availability was 78.44%for the month. <br /> Springs: Springs units 1, 2, 3 and 4 availability was 35.62%for the month. <br /> Salton Sea: The Salton Sea units operated at 38.90% capacity factor for the month. <br /> TRANSMISSION: <br /> Pacific DC: The South to North transmission line is currently derated to 975 MW (ETR 12/3112012) <br /> and the North to South transmission line is operational at 2,990 MW. <br /> Attached are the charts of daily peaks and the graphical comparison of demand and energy supplied <br /> from each resource for the months of May 2011 and May 2012. <br /> AA <br /> Attachments <br /> cc: Scott C. Barber, City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.