Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2012 BPU
>
06-15-12
>
06-15-12 BPU RPT 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2015 10:08:50 AM
Creation date
9/29/2015 10:01:41 AM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
06-01-2012 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2012 BPU
06-15-2012 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2012 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y t i <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTJLITIES <br /> BOARD OF PUBLIC UTILITIES DATE: June 15, 2012 <br /> ITEM NO: 3 <br /> SUBJECT: ELECTRICAL CABLE REPLACEMENT AT FIESTA AVENUE,IMPERIAL STREET AND <br /> GOODVIEW AVENUE -WORK ORDER NO. 1217690 <br /> ISSUE. <br /> That the Board of Public Utilities consider approval of Work Order No. 1217690. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of$284,400 for Work Order No. <br /> 1217690 to replace failed or defective 12kV distribution cable on Fiesta Avenue, Imperial Street and <br /> Goodview Avenue. <br /> BACKGROUND; <br /> On August 27, 2011, there was a 12kV cable failure in the Fiesta - Goodview Avenues area of the City. <br /> Riverside Public Utility(RPU) crews were able to restore service through switching the load to an alternate, <br /> adjacent circuit pending replacement of the failed cable. Subsequent investigation determined that the failed <br /> cable caused significant damage to the conduit, requiring its replacement as well. Also,the adjoining cables <br /> in that immediate area are identified to be replaced through the cable replacement program. <br /> Engineering has now been completed by RPU staff. The Project includes: <br /> • Installation of one S X 5' pull box <br /> • Installation of 3,897' of conduit <br /> • Replacement of 1200' of#2AL C[C HMPE cable with new 114AL XLPE cable in conduit <br /> • Approximately 36,000 sq. ft. of pavement grind and asphalt overlay <br /> • Approximately 103,544 sq, ft. of rubberized slurry <br /> All construction work including trenching,conduits,and other infrastructure work will be performed by contract <br /> crews from the Electric Contractors'Panel. Directional boring maybe used,if possible,to reduce the amount <br /> of street repairs needed. All electrical work including cable installation,splicing and terminationswil[be done <br /> performed by RPU field forces. <br /> The Project also includes deferred paving on Collingwood Drive,Amanda Court and Lydia Avenue due to a <br /> previous cable failure and repairs that occurred in September 2011. Paving for this work was deferred to help <br /> minimize the impact on focal residents and to allow for normal bidding processes to be used. Streets in this <br /> area were completely renovated by Public Works within the last three years. <br /> FISCAL IMPACT: <br /> The capital expenditure for the project is estimated to be $280,000 and is broken out as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.