Laserfiche WebLink
W A T E R I E N E R G Y I L I F E <br />-NP- RIVERSIDE PUBLIC UTILITIES <br />kl& <br />PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIES DATE: OCTOBER 2, 2015 <br />GENERAL MANAGERS REPORT <br />ITEM NO: 18 <br />SUBJECT: MONTHLY POWER SUPPLY REPORT — August 2015 <br />Power Usage: <br />Wholesale Load (Vista): — 252,658 MWH (Chart 1) <br />Peak Demand: — 570 MW of which 438 MW came from RVSD available resources (Chart 2) <br />RVSD Energy Mix (Chart 1): <br />Resource MWH <br />a) <br />Nuclear <br />9,360 <br />b) <br />Coal <br />60,579 <br />c) <br />Large Hydroelectric <br />2,524 <br />d) <br />Natural Gas <br />13,615 <br />e) <br />Renewables <br />52,921 <br />f) <br />Other (BPA) <br />7,560 <br />g) <br />Inter SC Trades <br />49,800 <br />h) <br />Green Inter SC Trades <br />- <br />i) <br />CAISO Purchases <br />56,399 <br />Total: <br />252,658 <br />Total Green Power Supply — <br />52,921 MWH which yields 20.95% of the Total Wholesale Load <br />Requirement <br />Resource Availabilit <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 96.77% capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 59.43% capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 20 MW, with energy entitlement of 2,524 MWH. <br />Natural Gas: Clearwater's availability was 100% for the month. <br />RERC's (Units 1, 2, 3 and 4) availability was 100.0% for the month. <br />Springs's (Units 1, 2, 3 and 4) availability was 100.00% for the month. <br />Renewable: Salton Sea units operated at 98.2% capacity factor for the month. <br />Wintec operated at 51.10% capacity factor. <br />WKN operated at 50.53% capacity factor. <br />Tequesquite Solar operated at 25.88% capacity factor. <br />AP North Lake Solar operated at 36.38% capacity factor. <br />Camelot Solar operated at 41.48% capacity factor. <br />Transwind operated at 23.50% capacity factor. <br />The attached graphical comparisons represents RPU's August: <br />Chart 1: Total Energy Requirements /Resource Mix <br />Chart 2: Peak Hour Total Capacity <br />Chart 3: Retail Customer Load <br />Chart 4: Daily Peak Load and Temperature Comparisons <br />Chart 5: Monthly Peak Load and Temperature <br />