W A T E R E N E R G Y I T F E <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: May 4, 2012 <br /> ITEM NO: 9 <br /> SUBJECT: CONSTRUCTION OF THE JURUPAIBROCKTON WATER DISTRIBUTION MAIN <br /> REPLACEMENT PROJECT--AWARD OF BID NO. 7057 <br /> ISSUE: <br /> That the Board of Public Utilities consider approval of a contract award for the construction of the <br /> Jurupa/Brockton Water Distribution Main Replacement Project, Bid No. 7057. <br /> RECOMMENDATIONS: <br /> That the Board of Public Utilities: <br /> 1. Approve the capital expenditure of$1,489,749.30 for Work Order No. 1020890, which includes al[ <br /> design, construction, change order contingencies, system connections, service tie-overs, <br /> construction management, inspection and geotechnical testing for the Jurupa/Brockton Water <br /> Distribution Main Replacement Project, Bid No. 7057; and <br /> 2. Award a contract for the construction of the JurupalBrockton Water Distribution Main Replacement <br /> Project, Bid No. 7057 to the lowest responsive bidder, C.P. Construction Co., Inc. of Ontario, <br /> California, in the amount of$991,559.30. <br /> BACKGROUND: <br /> Authorization is requested to construct the Jurupa./Brockton Water Distribution Main Replacement Project, Bid <br /> No. 7057. The project is generally located on Jurupa Avenue between Palm Avenue and Brockton Avenue <br /> and on Brockton Avenue between Jurupa Avenue and Edgewood Place (Attachment 1). The Project will <br /> involve the construction of approximately 2,950 linearfeet of 12-inch Ductile Iron Pipe, 1,050 linear feet of fl- <br /> inch Ductile Iron Pipe, nine fire hydrants,801-inch water services and four 2-inch water services, along with <br /> all associated fittings and appurtenances. This project is part of the Public Utilities Department's (RPU) <br /> ongoing water main replacement program to replace aging and undersized water mains and improve fire <br /> protection. <br /> The existing water distribution pipelines to be replaced are very old and have been prone to extensive leaking <br /> over the past several years. The existing 10-inch pipelines within Jurupa and Brockton Avenues were <br /> originally installed in 1924 and were constructed of cast iron pipe. By almost any measure,these pipelines <br /> have reached the upper limit of their useful service life. <br /> Bids were opened on April 23,2012. The lowest responsive bid was submitted by C.P.Construction Co., Inc. <br /> Staff has reviewed all provided documentation and has determined that C.P. Construction Co., Inc. has met <br /> all of the requirements of the specifications. <br />