Laserfiche WebLink
W A T E R E N E R G Y L I F E <br /> ar RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: April 6, 2012 <br /> ITEM NO: 8 <br /> SUBJECT: MAIN STREET POLE RELOCATION PROJECT - WORK ORDER NO. 1219355 <br /> ISSUE: <br /> Board of Public Utilities approval is requested for Work Order No. 1219355. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of $62,145 for the Main <br /> Street Pole Relocation Project. <br /> BACKGROUND: <br /> The Main Street Pole Relocation Project (Project) includes the replacement of various overhead facilities <br /> due to street improvement work driven by the City of Riverside Public Works Main Street Improvement <br /> Project. The Project involves the replacement of four poles, the replacement of two overhead <br /> transformer banks and the installation of 1,000 feet of secondary cable due to minor improvements made <br /> to the street. <br /> The electrical engineering was performed by Riverside Public Utilities (RPU) staff. Electrical work will be <br /> performed by contract and RPU field forces. <br /> FISCAL IMPACT: <br /> The total estimated cost for Work Order 1219355 is $62,145. Sufficient funds are available in the Major <br /> Feeders Account No. 6130000-470633. <br /> % of <br /> Total <br /> Design, Construction M mt, Inspection $6,836 11% <br /> Construction—Electric Overhead Installation $36,044 58% <br /> Construction —Removals $13,672 22% <br /> Contingency $5,593 9% <br /> Subtotal: $62,145 1 100% <br /> Prepared by: Stephen H. Badgett, Public Utilities Deputy General Manager/Energy Delivery <br /> Approved by: David H. Wright, Public Utilities General Manager <br /> Approved by: Belinda J. Graham, Assistant City Manager <br /> Approved as to form: Gregory P. Priamos, City Attorney <br />