Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2012 BPU
>
03-02-12
>
03-02-12 BPU RPT 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2015 12:18:36 PM
Creation date
9/25/2015 2:48:51 PM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
03-02-2012 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2012 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y I ! F F <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: March 2, 2012 <br /> ITEM NO: 4 <br /> SUBJECT: CONSTRUCTION OF THE MAIN STREET WATER PIPELINE REPLACEMENT <br /> PROJECT BETWEEN THIRD AND SPRUCE STREETS <br /> ISSUE: <br /> That the Board of Public Utilities consider approval of the capital expenditure in the amount of$986,000 to <br /> construct the Main Street Water Main Replacement Project between Third and Spruce Streets. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the capital expenditure of$986,000 for Work Order No. 1206402, <br /> which includes all design and construction costs for the Main Street Water Main Replacement Project <br /> between Third and Spruce Streets. <br /> BACKGROUND: <br /> The Public Works Department(PW)is scheduled to perform a street improvement project along Main Street <br /> between Third and Spruce Streets. The project will entail construction of new asphalt pavement, in addition <br /> to segments of new concrete curb, gutter and sidewalk. <br /> In anticipation of the street improvement project,the Riverside Public Utilities Department(RPU)Water Field <br /> Division will replace the old water distribution pipeline that currently exists within this segment of roadway. <br /> The water pipeline relocation work will generally include the construction of approximately 3,175 linearfeet of <br /> 12-inch ductile iron pipe,five fire hydrants and 43 domestic water services,as well as all other related fittings <br /> and appurtenances. <br /> Once the new water pipelines are installed, RPU will be responsible for trench resurfacing. The trench <br /> resurfacing will be in accordance with PW paving standards. However,the exact scope of the paving work <br /> will be more specifically defined after the pipeline construction has begun and the actual trench limits are <br /> established in the field. Staff will solicit paving bids from RPU's Paving Contractor Panel to coincide with the <br /> completion schedule of the project. <br /> Also, many of the water services in this area are located within concrete driveways and sidewalks. The <br /> concrete repair work will be performed by the PW contractor. RPU will reimburse PW for the cost of these <br /> concrete repairs based on a proration of the work performed and the unit bid prices. A budgetary estimate for <br /> the trench resurfacing work has been included in this authorization. <br />
The URL can be used to link to this page
Your browser does not support the video tag.