Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2012 BPU
>
02-17-12
>
02-17-2012 BPU RPT 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2015 12:13:34 PM
Creation date
9/25/2015 11:40:54 AM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
02-17-2012 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2012 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: February 17, 2012 <br /> ITEM NO: 3 <br /> SUBJECT: OVERLOOK PARKWAY FEEDER RELIEF AND SWITCH REPLACEMENT -WORK <br /> ORDER NO. 1242317 <br /> ISSUE: <br /> Board of Public Utilities approval is requested for Work Order No. 1202317. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of$225,000 for Work Order <br /> No. 1202317 to install underground conduits, structures, cables, and a pad-mount switch with junction <br /> cabinets. <br /> BACKGROUND: <br /> As part of the Circuit 1533 load relief project in 2010, a load transfer scheme from Circuit 1533 to Circuit <br /> 1540 via switches along Overlook Parkway was proposed. Upon performing the recommended load <br /> transfer, Electric crews discovered that below grade switches OS3-126 and switch GS3-210 were <br /> inoperable due to oil leakage and other maintenance and operational problems. Operation of these <br /> devices in this state and in a confined space is un-safe. Switching capabilities are crucial for <br /> sectionalizing and transferring large residential loads to Circuit 1540. It is Department policy to install <br /> switching devices in a pad-mounted configuration for ease of operation, minimize outages thus improving <br /> reliability and reduce crew exposures to switching in a confined space. <br /> This project will install conduit and structures to replace the two outdated and defective underground <br /> switches with a single pad-mounted switch, as well as three pad-mount junction cabinets and all <br /> associated cables. The pad-mounted equipment was designed and will be installed with consideration <br /> given to the surrounding aesthetics. <br /> The electrical engineering was performed by Riverside Public Utility (RPU)forces. All civil work including <br /> trenching, conduits, foundations and other infrastructure work will be performed by a contractor through <br /> the competitive bid process. Electrical work will be performed by RPU field forces. <br /> FISCAL IMPACT: <br /> The capital expenditure for the entire project is estimated to be $225,000 and includes all construction, <br /> contingencies, construction management, inspection and design, as summarized in the following table: <br /> % of <br /> Total <br /> Construction-Electric Conduit& Structures $100,675 45% <br /> Contingency 10% $10,068 4% <br /> Construction-Electric Overhead and Underground $89,158 40% <br /> Design, Construction Management, Inspection $25,000 11% <br /> Subtotal: $224,901 100 % , <br />
The URL can be used to link to this page
Your browser does not support the video tag.