Laserfiche WebLink
RIVERSIDE PUBLIC UTILITIES <br /> W& Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: February 3, 2012 <br /> ITEM NO: 5 <br /> SUBJECT: REMOVE AND REPLACE EXISTING FLUTED STEEL STREETLIGHT STANDARDS <br /> —WORK ORDER NO. 1202299 <br /> ISSUE: <br /> That the Board of Public Utilities consider approval of Work Order No. 1202299. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of $97,287 for Work Order <br /> No. 1202299 to remove the existing steel streetlight standards with overhead conductors and replace <br /> with concrete streetlights with underground conduit and cable. <br /> BACKGROUND: <br /> As the City of Riverside annexes surrounding areas, the electrical distribution infrastructure within the <br /> annexed area is transferred to the Riverside Public Utilities (RPU) distribution system. Many of the <br /> streetlights that are located in these annexed areas were formerly part of SCE's system and include <br /> fluted steel pole streetlights installed on footings that were served with overhead conductors. Recently, <br /> the last fluted steel pole in RPU's stock was used. Pole manufacturers no longer support fluted steel <br /> replacement poles that fit on the existing anchors found in various areas of the City of Riverside. <br /> Public Works is improving sidewalks on Dorset, Layton and Wallingham Drives. Coincident with these <br /> improvements, RPU proposes to remove nine of the existing fluted steel poles in this area and re-use <br /> them as stock for future annexed areas as noted above. The fluted steel poles would be replaced by <br /> installing nine new concrete streetlight standards along with the associated cable, conduit and secondary <br /> risers, and a new 25 KVA transformer. <br /> FISCAL IMPACT: <br /> The capital expenditure for the entire project is estimated to be $97,287 and includes all construction, <br /> contingencies, construction management, inspection and design as summarized in the following table: <br /> % of Total <br /> Construction-Street Lighting Conduit & Structures $76,028 78.1% <br /> Construction-Street Lighting OH & UG $4,718 4.8% <br /> Design, Construction Management, Inspection $7,697 7.9% <br /> Contingency 10% $8,844 9.2% <br /> Subtotal: $97,287 100% <br /> Sufficient funds are available for this project in the Major Street Lighting Project Account No. 6130000- <br /> 470637. <br />