Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2012 BPU
>
02-03-12
>
02-03-2012 BPU RPT 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2015 12:10:43 PM
Creation date
9/25/2015 10:48:13 AM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
02-03-2012 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2012 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
RIVERSIDE PUBLIC UTILITIES <br /> } <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: February 3, 2012 <br /> ITEM NO: 4 <br /> SUBJECT: CASA BLANCA SUBSTATION FEEDER RECONFIGURATION -WORK ORDER <br /> NO. 1112780 <br /> ISSUE: <br /> That the Board of Public Utilities consider approval of Work Order No. 1112780. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of $435,000 for Work Order <br /> No. 1112780 to install underground structures, cables and steel pole foundations along Evans Street <br /> between Pliny and Madison Streets. <br /> BACKGROUND: <br /> The Casa Blanca Substation project requires the reconfiguration of distribution feeders. The work <br /> proposed under Work Order No. 1112780 consists of: a) the installation of the underground getaways for <br /> the Casa Blanca Substation along Evans Street; and b) the extension of new conduits to a riser pole for <br /> future circuit reconfiguration along Evans Street between Samuel and Madison Streets. This project <br /> includes the installation of 2,508 feet of new conduit, underground cabling, substructures and four steel <br /> pole foundations, as well as street improvements. <br /> The electrical engineering was performed by a consultant chosen through Riverside Public Utilities <br /> (RPU) Consultant Panel. All civil work including trenching, conduits, foundations and other infrastructure <br /> work will be performed by a contractor through the competitive bid process. Electrical work will be <br /> performed by RPU field forces. <br /> The Substation feeder reconfiguration is part of the overall Casa Blanca Substation project which was <br /> approved by the Board on September 17, 2010 and totals approximately$15 million, as specified below: <br /> Substation Work $ 9,000,000 <br /> Land Acquisition/Associated Work $ 1,540,000 <br /> 4-12 kV Conversion $ 800,000 <br /> Cable Replacement $ 380,000 <br /> Feeders $ 2,650,000 <br /> Transmission $ 680,000 <br /> $15,050,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.