Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2012 BPU
>
01-20-12
>
01-20-2012 BPU RPT 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 2:25:07 PM
Creation date
9/25/2015 10:17:44 AM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
01-20-2012 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2012 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
Riverside Public Utility <br />Electric t Water Utility Acronyms <br />ACWA <br />Assoclaidon of California Water Agencies <br />AF <br />Acre Feet <br />AMR <br />Automated Meter Reading <br />AMWA <br />Association of Mettopolitan Water Agenctes <br />APPA <br />American Public Power Association <br />AQMD <br />AKr Quality Management District <br />AWWA <br />American Water Works Association <br />BPA <br />Bonneville Power Admintstrafion <br />CADME <br />Computer Aided Desig n Mapping Engin eerin <br />CAISO <br />California Indepdendent System Operator <br />CDWR <br />Califomla Department of Water Resouroes <br />CEC <br />Califamla Energy Commission <br />CEQA <br />California Environmental Quality Act <br />CIP <br />Capital Improvement Plan <br />CIS <br />Customer Information System <br />CMUA <br />Calif. Municipal Utilities Association <br />CPUC <br />Calif. Public Utilities Commisslon <br />CREB <br />Clean Renewable Energy Bands <br />CRR <br />Congestlon Revenue Rights <br />CTA <br />Competitive Transition Account <br />CTC <br />Competitive Transition Charge <br />D6CP <br />Dib romochlororopane <br />DSC <br />Debt Service Coverage <br />DSM <br />Demand Side Management <br />EGF <br />Electric Generating Facility <br />EIA <br />EneM Information Agency <br />EIR <br />Environmental Impact Report <br />EMF <br />Electric Magnetic Fields <br />EOC <br />Emergency Operations Center <br />EPAct <br />E nergy Policy Act of 2005 <br />ERC <br />Emission Reduction Credits <br />ESP <br />Electric Service Provider <br />FERC <br />Federal Energy Regulatory Commission <br />FTR <br />Firm Transmission Rights <br />GFT <br />Generai Fund Transfer <br />GIS <br />Geographic Information System <br />GMC <br />Grid Management Charge <br />IOU <br />Investor Owned Utility <br />IPA <br />Intermountain Power Agency <br />IPP <br />Intennountafn Power Project <br />IRP <br />Integrated Resource Plan <br />ISO <br />Independent System Operator <br />IT <br />Information Technology <br />JPA <br />Joint Powers Agency <br />KPI <br />Key Performance Indicator <br />kVA <br />Kilovolt Amps (transformer size) <br />kW <br />Kilowatt <br />kWh <br />Kilowatt hours <br />LMP <br />Locational Marginal Pricing <br />LSE <br />Load Serving Entity <br />MCP <br />Market Clearing Price <br />MGD <br />Million Gallons per Da <br />MMbtu <br />Million British Thermal Units <br />MRTU <br />Market Redesign Technology Update <br />Item 19 <br />MSS <br />Metered Subsystem <br />MTM <br />Market -to -Market <br />MVA <br />Meqavoq Amps (substation transformer size) <br />MW <br />Megawatt <br />MWh <br />iMegawatt Hours <br />NCPA <br />Northern Cafifomia Power Agency <br />NERC <br />North American Electric Reliability Council <br />NPDES <br />National Pollution Dlscha a Elimination System <br />NRC <br />Nuclear Regulatory Commission <br />OH <br />Overhead <br />C&M <br />Operation and Maintenance <br />PAC <br />Power Agency of Californle <br />PBC <br />Public Benefits Charge <br />PCAC <br />Power Cost Adjustment Clause <br />PGA <br />Participating Generator Agreement <br />PIRP <br />Participating Intermittent Resource Program <br />PL <br />Participating Loads <br />PLR <br />Private Letter Ruling <br />PM 10 <br />Particulate Matter 10 microns c less <br />POU <br />Publicly Owned Udifty <br />PTO <br />Participating Transmission Owner <br />PV <br />Photovoltaic <br />OF <br />Quallffrg Facillty <br />RA <br />Resource Adequacy <br />RAR <br />Resource Adequacy Requirements <br />REPI <br />Renewable E nergy Production Incentives <br />RERC <br />Riverside Energy Resource Center <br />RMC <br />Risk Management Committee <br />RMR <br />Reliability Must Run <br />RPS <br />I Renewable Portfollo Standard <br />RPU <br />Riverside Public Utilities <br />RTO <br />Re [anal Transmission Organization <br />RTRP <br />Riverside Transmission Rellabillty Project <br />SAIDI <br />System Average Interruption Duration Index <br />SAIR <br />System Average Interruption Frequency Index <br />SC <br />Scheduling Coordinator <br />SCADA <br />Supervisory Control and Data Acquistion <br />SCAQMD <br />Southcoest Air Quality Management District OR AQMD <br />SCPPA <br />Southern Cal. Public Power Authority <br />SEER <br />Seasonal Energy Efficiency Rating <br />SMD <br />Standard Market Design <br />SONGS <br />San Onofre Nuclear Generating Station <br />T&D <br />Transmission & Distribution <br />TAC <br />Transmission Access Charge <br />TES <br />Thermal Energy Storage <br />TOU <br />Time of Use <br />TRR <br />Transmission Revenue Requirement <br />UDC <br />Utility Distribution Company <br />LIFE <br />Unaccounted For Energy <br />UG <br />Underground <br />LIOC <br />Utilities Operations Center <br />WOMSISPL <br />Work Order Management System <br />WSCC <br />Westem Systems Coordiratng Counell <br />WSPP <br />Western Systems Power Pool <br />
The URL can be used to link to this page
Your browser does not support the video tag.