RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> P U 5 L I C UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: March 1, 2013 <br /> ITEM NO: 4 <br /> SUBJECT: CONSTRUCTION OF THE MOUND STREET MAIN REPLACEMENT PROJECT — <br /> WORK ORDER NO. 1228476 <br /> ISSUE: <br /> The item for Board of Public Utilities consideration is approval of the capital expenditure in the amount of <br /> $1,505,000 to construct the Mound Street Main Replacement Project. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the capital expenditure of $1,505,000 for Work Order No. <br /> 1228476 which includes all design, construction, paving, contract administration and construction <br /> contingency costs for the Mound Street Main Replacement Project, <br /> BACKGROUND: <br /> The construction of the Mound Street Main Replacement Project is part of the on-going water main <br /> replacement program to replace old and high priority leaky mains. The project area consists of existing <br /> 2-inch, 3-inch, 4-inch and 6-inch cast iron water mains that were installed by the Highlander Water <br /> Company between 1900 and 1959 and have experienced several leaks. The City of Riverside acquired <br /> the Highlander Water Company in 1960. The work will entail the construction of approximately 5,000 <br /> linear feet of 8-inch ductile iron pipe, 15 fire hydrants, 81 service tie-overs, and 12 system connections. <br /> The work identified will be constructed by the Water Division's field forces. <br /> Once the new water pipelines are installed, Riverside Public Utilities (RPU) will be responsible for <br /> standard trench repaving per the County of Riverside standard. Near the end of pipeline construction, <br /> staff will solicit paving bids for paving the trench area through the Public Utilities Paving Contractor's <br /> Panel. A budgetary estimate for the paving work has been included in this authorization. <br /> FISCAL IMPACT: <br /> The total capital expenditure for Work Order No. 1228476 is estimated to be $1,505,000, as summarized <br /> in the following table: <br /> Description Cost Percent of Total <br /> Design $70,000 4.7% <br /> Construction (City Forces) $990,000 65.8% <br /> Paving Budget (Contractor Panel) $300,400 19.9% <br /> Construction Survey/Testing $15,000 1.0% <br /> Contract Management/inspection (Paving) $30,004 2.0% <br /> Contingency $100,0001 6.6°I0 <br /> Work Order Total $1,505,000 1 100% <br /> Sufficient funds are available in the Public Utilities'Water Main Replacement Account No. 6230000- <br /> 470707. <br />