W A T E R E N F R G Y f l F f <br /> RIVERSIDE PUBLIC UTILITIES <br /> L3W& Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: April 5, 2013 <br /> ITEM NO: 4 <br /> SUBJE T: HARVEY LYNN SUBSTATION SWITCHGEAR BUS TIE RECONFIGURATION - <br /> WORK ORDER NO. 1316526 <br /> ISSUE: <br /> The issue for Board of Public Utilities consideration is approval of Work Order No. 1316526. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of $98,238 for reconfiguring <br /> Sw Itchgear 2, 3 and 5 ties located at Harvey Lynn Substation to improve system reliability. <br /> B CKGROUND: <br /> On November 20,2012, a bus fault occurred on the Harvey Lynn 12 kV switchgear bus tie. The fault was <br /> caused by severe corrosion of a section of bus and was immediately repaired. However, to improve <br /> system reliability, staff is recommending reconfiguring the switchgear bus ties. <br /> The project consists of the installation of approximately 500 feet of new conduits, removal of existing <br /> cables and installation of approximately 3,600 feet of 12 kV underground cable. The project will also <br /> include the removal of a cabinet and the installation of protective barrier to cover the side of the <br /> switchgear cabinet. <br /> Engineering design will be performed by Riverside Public Utilities (RPU) engineering staff and <br /> construction will be performed by RPU field forces. <br /> FISCAL IMEACT: <br /> The capital expenditure for the project is estimated to be $106,093. This includes all construction, <br /> contingencies, construction management and design,as summarized in the following table: <br /> Cost $ %of Total <br /> Equipment and Construction Materials $29,528 2B% <br /> Engineering Labor Including Overhead $9,708 , 9% <br /> Construction Labor Including Overhead $49,175 4896 <br /> Contingency 8,827 10% <br /> Total 1 $98,238 10096 <br /> Sufficient funds are available in the Public Utilities' Substation Bus & Upgrades Account No. 6130000- <br /> 47061 B. <br />