Laserfiche WebLink
W A T E R E N E R G Y [ [ F E <br /> a III& RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: April 19, 2013 <br /> ITEM NO: 19 <br /> SUBJECT. WATER HIGHLIGHTS--March 2013 <br /> Domestic water production for the month of March 2013, totaled 5,005 acre feet (1,631 million gallons), <br /> with the following resource mix: <br /> • Bunker Hill Basin: 61% <br /> • Riverside Basin: 39% <br /> • Purchased Water: 0% <br /> Peak water usage for the month of March 2013, was 56.2 million gallons per day (mgd) and occurred on <br /> March 1 st. <br /> Under the Cooperative Agreement for Water Production and Conveyance with Western Municipal Water <br /> District, 463.8 AF of potable water and 18.5 AF of irrigation water were delivered to WMWD. 36.4 AF <br /> were sold to the Home Gardens Community Services District. <br /> There were no significant events for the water system in March 2013. <br /> Current Period Last Month March 2012 <br /> Peak Consumption: 56.2 mgd 50.2 mgd 58.8 mgd <br /> Average Consumption: 45.0 mgd 41.4 mgd 47.5 mgd <br /> Minimum Consumption: 36.3 mgd 33.7 mgd 34.6 mgd <br /> Total Consumption: 5,005 AF 3,738 AF 4,735 AF <br /> Peak Temperature: 94 82 89 <br /> Average Temperature: 76 68 71 <br /> Minimum Temperature: 54 52 56 <br />