Home
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2013 BPU
>
04-19-13
>
04-19-2013 BPU RPT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2015 3:26:20 PM
Creation date
9/23/2015 3:20:31 PM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
04-19-2013 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2013 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y L I P F <br /> RIVERSIDE PUBLIC UTILITIES <br /> Eawd Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: April 19, 2013 <br /> ITEM NO: 6 <br /> SUBJECT: CONSTRUCTION OF THE MULBERRY BOOSTER PUMP STATION <br /> REHABILITATION PROJECTâAWARD OF BID NO. 7125 <br /> ISSUE: <br /> The item for Board of Public Utilities consideration is approval of the capital expenditure in the amount of <br /> $542,500 to construct the Mulberry Booster Pump Station Rehabilitation Project, Bid No. 7125. <br /> RECOMMENDATIONS: <br /> That the Board of Public Utilities: <br /> 1. Approve the capital expenditure in the amount of $542,500 for Work Order No. 1304150, which <br /> Includes all design, construction, change order contingencies, system connections, construction <br /> management, inspection and geotechnical testing for the Mulberry Booster Pump Station <br /> Rehabilitation Project, Bid No. 7125; and <br /> 2. Award a contract for the construction of the Mulberry Booster Pump Station Rehabilitation <br /> Project, Bid No. 7125 to the lowest responsive bidder, Cora Contractors, Inc. of Palm Desert, <br /> California, in the amount of$344,325. <br /> BACKGROUND: <br /> Originally built in 1934, the Mulberry Booster Pump Station (Mulberry) supplies water to the Chicago <br /> 1100 Pressure Zone, which includes both the Eastside and Hunter Industrial Park neighborhoods and <br /> supports the University of California, Riverside. Two of the three pumps within the Station have <br /> exceeded their useful life and need replacement. In addition, Mulberry's pumping capacity needs to be <br /> increased to meet existing and future demands. <br /> This project will increase the capacity of Mulberry and enhance water system reliability within the <br /> Chicago 1100 Zone. The project will include replacing two pumps with higher capacity pumps; upsizing <br /> about 200 linear feet of suction pipeline from 12-inch to 24-inch diameter pipe; replacing interior piping; <br /> and installing new electrical equipment. Work in the Applebee's restaurant parking lot and adjacent <br /> street will be performed during nighttime hours to minimize impact to the restaurant and patrons. <br /> Bids were opened on April 2, 2013. The lowest responsive bid was from Cora Contractors, Inc. Staff <br /> has reviewed all provided documentation and has determined that Cora Contractors, Inc. has met all of <br /> the requirements of the specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.