W A T E R E N E R G Y L I P F <br /> RIVERSIDE PUBLIC UTILITIES <br /> Eawd Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: April 19, 2013 <br /> ITEM NO: 6 <br /> SUBJECT: CONSTRUCTION OF THE MULBERRY BOOSTER PUMP STATION <br /> REHABILITATION PROJECT—AWARD OF BID NO. 7125 <br /> ISSUE: <br /> The item for Board of Public Utilities consideration is approval of the capital expenditure in the amount of <br /> $542,500 to construct the Mulberry Booster Pump Station Rehabilitation Project, Bid No. 7125. <br /> RECOMMENDATIONS: <br /> That the Board of Public Utilities: <br /> 1. Approve the capital expenditure in the amount of $542,500 for Work Order No. 1304150, which <br /> Includes all design, construction, change order contingencies, system connections, construction <br /> management, inspection and geotechnical testing for the Mulberry Booster Pump Station <br /> Rehabilitation Project, Bid No. 7125; and <br /> 2. Award a contract for the construction of the Mulberry Booster Pump Station Rehabilitation <br /> Project, Bid No. 7125 to the lowest responsive bidder, Cora Contractors, Inc. of Palm Desert, <br /> California, in the amount of$344,325. <br /> BACKGROUND: <br /> Originally built in 1934, the Mulberry Booster Pump Station (Mulberry) supplies water to the Chicago <br /> 1100 Pressure Zone, which includes both the Eastside and Hunter Industrial Park neighborhoods and <br /> supports the University of California, Riverside. Two of the three pumps within the Station have <br /> exceeded their useful life and need replacement. In addition, Mulberry's pumping capacity needs to be <br /> increased to meet existing and future demands. <br /> This project will increase the capacity of Mulberry and enhance water system reliability within the <br /> Chicago 1100 Zone. The project will include replacing two pumps with higher capacity pumps; upsizing <br /> about 200 linear feet of suction pipeline from 12-inch to 24-inch diameter pipe; replacing interior piping; <br /> and installing new electrical equipment. Work in the Applebee's restaurant parking lot and adjacent <br /> street will be performed during nighttime hours to minimize impact to the restaurant and patrons. <br /> Bids were opened on April 2, 2013. The lowest responsive bid was from Cora Contractors, Inc. Staff <br /> has reviewed all provided documentation and has determined that Cora Contractors, Inc. has met all of <br /> the requirements of the specifications. <br />