Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2013 BPU
>
11-15-13
>
11-15-2013 BPU RPT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2015 4:45:50 PM
Creation date
9/22/2015 3:22:25 PM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
11-15-2013 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2013 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
WATER . ENERGY L 1 F E <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> M M1111111111111111 <br /> BOARD OF PUBLIC UTILITIES DATE: November 15, 2013 <br /> ITEM NO: 6 <br /> SUBJECT: FIRST AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL CONSULTANT <br /> SERVICES FOR THE WATER ENERGY MANAGEMENT PLAN PROJECT <br /> ISSUE: <br /> The item for Board of Public Utilities consideration is approval of a First Amendment to the Professional <br /> Services Agreement with Kennedy/Jenks Consultants to extend the term through April 30, 2014 for the <br /> Water Energy Management Master Plan Study Project (Project). <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve a First Amendment to the Professional Service Agreement with <br /> Kennedy/Jenks Consultants for professional consulting for the Water Energy Management Master Plan <br /> Study Project to extend the term through April 30, 2014. <br /> BACKGROUND: <br /> On July 2, 2012, the City of Riverside entered into an Agreement with Kennedy/Jenks Consultants <br /> (Consultant) for preparation of the Project for the water system of the Public Utilities Department (RPU). <br /> The aim of the Project is to identify ways to optimize energy use, minimize energy costs and develop <br /> alternative lower cost sources of energy where feasible. Delays in execution of the Agreement, unforeseen <br /> RPU staff changes and additional time needed to collect the pertinent data have delayed the Project. <br /> These delays require a First Amendment to the Agreement to extend the term through April 30, 2014 to <br /> meet the Consultant and staff's availability to perform the remaining analyses and complete the Project. <br /> The Project has already provided many recommendations for reducing energy consumption, which are <br /> currently being implemented. <br /> FISCAL IMPACT: <br /> There is no fiscal impact associated with this report. <br /> Prepared by: Todd L. Jorgenson, Interim Public Utilities Assistant General ManagerMater <br /> Approved by: Stephen H. Badgett, Interim Public Utilities General Manager <br /> Approved by: Belinda J. Graham, Assistant City Manager <br /> Approved as to form: Gregory P. Priamos, City Attorney <br /> Attachment: <br /> 1. First Amendment <br />
The URL can be used to link to this page
Your browser does not support the video tag.