Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2013 BPU
>
11-01-13
>
11-01-2013 BPU RPT 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2015 2:38:06 PM
Creation date
9/22/2015 12:56:03 PM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
11-01-2013 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2013 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A I : R E N E R G Y L I F L. <br /> L3W& RIVERSIDE PUBLIC UTILITIES <br /> PUBLIC UTILITIES <br /> Board Memorandum <br /> BOARD OF PUBLIC UTILITIES DATE: November 1, 2013 <br /> DIRECTOR'S REPORT <br /> ITEM NO: 17 <br /> SUBJECT: MONTHLY POWER SUPPLY REPORT—September 2013 <br /> POWER USAGE <br /> Total load requirements (including losses) during September 2013 were 250,314 MWh and 80,249 MWh <br /> of purchases from the CAISO, of which 170,065 MWh were provided by our resources and other <br /> purchases. The retail customer load for September 2013 (242,739 MWh)was 5.1% higher than the retail <br /> customer load in September 2012 (231,069 MWh). The actual peak system demand was 578 MW, <br /> compared to actual peak system demand of 543 MW last year. Energy returns were 3,960 MWh and <br /> 3,156 MWh were attributed to losses (4.31%). Green power supplied approximately 24.24% of our retail <br /> energy requirements. <br /> The City's generation resources were available during the month as follows: <br /> UNIT OPERATION <br /> IPP: IPP units 1 and 2 operated at 58.68% capacity factor for the month. <br /> PVNGS: Palo Verde units 1, 2 and 3 operated at 98.46% capacity factor for the month. <br /> Hoover: 86.72% of RVSD's entitlement was met as compared to WAPA's Master Schedule (dated <br /> 5/14/12). <br /> Clearwater: Clearwater's availability was 100% for the month. <br /> RERC: RERC Station (Units 1,2,3 and 4) availability was 99.9% for the month. <br /> Springs: Springs units 1, 2, 3 and 4 availability was 99.27% for the month. <br /> Salton Sea: The Salton Sea units operated at 75.83% capacity factor for the month. <br /> TRANSMISSION: <br /> Pacific DC: The South to North transmission line is currently derated to 975 MW (ETR 12/31/2013) <br /> and the North to South transmission line is operational at 2,990 MW. <br /> Attached are the charts of daily peaks and the graphical comparison of demand and energy supplied <br /> from each resource for the months of September 2012 and September 2013. <br /> AA <br /> Attachments <br /> cc: Scott C. Barber, City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.