W R I E R E N E R G Y <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: November 1, 2013 <br /> ITEM NO: 4 <br /> SUBJECT: PRIMARY CABLE BURN UP REPAIR ON AEGEAN AND ANTARES DRIVES - <br /> WORK ORDER NO. 1407874 <br /> ISSUE: <br /> The item for Board of Public Utilities consideration is approval for Work Order No. 1407874 to repair <br /> primary cable burn up on Aegean and Antares Drives. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the capital expenditure of$65,000 for Work Order No.1407874. <br /> BACKGROUND: <br /> On Thursday, September 26, 2013, at 1:44 a.m., 12 kV cable in conduit (type #2 AL XLPE) faulted on <br /> Aegean and Antares Drives. Crews were unable to remove the existing cable and installed a temporary <br /> 12 kV primary riser between structures to restore service by 2:37 p.m. <br /> Contract crews from International Line Builders, a member of the Contractors' Panel for Energy Delivery <br /> Work, were directed to bore or trench 595 feet, install 595 feet of conduit and a three feet by five feet <br /> primary pull box to begin the restoration of the electrical distribution system to its normal operating <br /> condition. <br /> The project's schedule and timing are shown in the table below: <br /> Project Schedule <br /> Engineering Performed By: RPU <br /> Civil Construction Performed By: Contract crews from International Line Builders <br /> Electrical Work Performed By: RPU field forces <br /> Anticipated Start Date: October 10,2013 <br /> Anticipated Duration: 4 weeks <br /> FISCAL IMPACT: <br /> The total project cost is estimated at $65,000 the breakdown is as follows: <br /> Cost $ %of Total <br /> Design, Construction Management, Inspection $3,500 5% <br /> Construction— Electric Conduit $35,000 54% <br /> Contingency $6,500 10% <br /> Construction—Electric Overhead and Underground $20,000 31% <br /> Total $65,000 100% <br />