Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2013 BPU
>
10-18-13
>
10-18-2013 BPU RPT 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2015 12:04:22 PM
Creation date
9/22/2015 11:13:24 AM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
10-18-2013 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2013 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
V, A 1 E R E N E R G Y l 7 c <br /> RIVERSIDE PUBLIC UTILITIES <br /> L3W& Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: October 18, 2013 <br /> ITEM NO: 10 <br /> SUBJECT: BID NO. 7186—AWARD OF CONTRACT FOR CONSTRUCTION OF THE LINDEN <br /> RESERVOIR ROOF REPLACEMENT PROJECT—WORK ORDER NO. 1217451 <br /> ISSUE: <br /> The item for Board of Public Utilities consideration is the award of a contract to construct the Linden <br /> Reservoir Roof Replacement Project, Bid No. 7186. <br /> RECOMMENDATIONS: <br /> That the Board of Public Utilities: <br /> 1. Approve the capital expenditure of $5,865,813.70 for Work Order No. 1217451 which includes <br /> all design, construction, change order contingencies, construction management and inspection <br /> services for the Linden Reservoir Roof Replacement Project, Bid No. 7186; <br /> 2. Award a contract for the construction of the Linden Reservoir Roof Replacement Project, Bid <br /> No. 7186, to the lowest responsive bidder, Canyon Springs Enterprises dba RSH Construction, <br /> of Hemet, California, in the amount of$4,373,467; and <br /> 3. Authorize the issuance of change orders to the purchase order of up to ten-percent of the <br /> original amount for Bid No. 7186. Such changes will be reported to the Board of Public Utilities <br /> at the conclusion of the project. <br /> BACKGROUND: <br /> The Riverside Public Utilities Department (RPU) owns and operates an existing 16 million gallon (MG) <br /> water storage facility known as Linden Reservoir. Linden Reservoir is situated immediately adjacent to <br /> Evans Reservoir, which also has a 16 MG capacity. These reservoirs are operated together and are a <br /> major source of water supply for the City. This reservoir complex is generally located at the southeast <br /> corner of Linden Street and Cranford Avenue (Attachment 1). <br /> The Linden Reservoir (Linden) was originally constructed in 1927 and has undergone several <br /> rehabilitations over the years. Most recently in the 1980's, Linden underwent an extensive <br /> rehabilitation which involved a structural overhaul of its concrete lining system to repair cracks and <br /> ensure water-tightness. Today, Linden's existing steel framed roof, which was built in the 1950's, <br /> shows obvious signs of corrosion and other damage. In 2009, under their contract for the design of the <br /> Evans Reservoir Replacement Project, AECOM conducted a condition assessment of Linden. Their <br /> report confirmed the poor condition of Linden's roof and recommended that a comprehensive roof <br /> replacement be planned in the near future. <br />
The URL can be used to link to this page
Your browser does not support the video tag.