Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2013 BPU
>
10-18-13
>
10-18-2013 BPU RPT 05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2015 12:02:28 PM
Creation date
9/22/2015 11:11:43 AM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
10-18-2013 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2013 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
ti RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: October 18, 2013 <br /> ITEM NO: 5 <br /> SUBJECT: OVERHEAD ELECTRIC POLE RELOCATION ALONG MAGNOLIA AVENUE BETWEEN <br /> MADISON AND JACKSON STREETS—WORK ORDER NO. 1405199 <br /> ISSUE: <br /> The issue for Board of Public Utilities consideration is approval of the estimated capital expenditure of <br /> $130,000 for Work Order No. 1405199 for the relocation of five electric utility poles for the 2013/2014 Arterial <br /> Streets Maintenance Phase 1 Project. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of$130,000 for Work Order No. <br /> 1405199 to relocate five electric utility poles for the Public Work's 2013/2014 Arterial Streets Maintenance <br /> Phase 1 Project along Magnolia Avenue between Madison and Jackson Streets. <br /> BACKGROUND: <br /> The Public Works Department will be re-constructing multiple median noses along Magnolia Avenue between <br /> Madison and Jackson Streets(Attachment 1). These improvements require the relocation of five poles,the <br /> addition of five new poles and rework of the associated distribution and transmission facilities.. <br /> Riverside Public Utilities (RPU) staff completed the project engineering with consideration given to the <br /> surrounding aesthetics,while ensuring that such consideration did not impact the cost of construction. The <br /> project breakdown is as follows: <br /> Project Breakdown <br /> Engineering Performed By: RPU Engineering staff <br /> Civil Construction Performed By: None required <br /> Electrical Work Performed By: RPU Field Forces <br /> Anticipated Start Date: October 23, 2013 <br /> Anticipated Duration: 4 weeks <br /> Coordination Required With: Public Works 2013/14 Arterial Streets Maintenance Phase 1 Project <br /> Reimbursements: None <br /> FISCAL IMPACT: <br /> The capital expenditure for Work Order No. 1405199 is estimated to be$130,000. This includes all design <br /> and construction as summarized in the following table: <br /> % Of <br /> Total <br /> Engineering Design $25,000 19% <br /> Construction RPU Field Forces $105,000 81% <br /> Total $130,000 100% <br />
The URL can be used to link to this page
Your browser does not support the video tag.