Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2013 BPU
>
09-20-13
>
09-20-2013 BPU RPT 05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2015 8:32:26 AM
Creation date
9/21/2015 4:39:12 PM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
09-20-2013 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2013 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
RIVERSIDE PUBLIC UTILITIES <br /> ago Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: September 20, 2013 <br /> ITEM NO: 5 <br /> SUBJECT: OVERHEAD ELECTRICAL POLE RELOCATION ALONG VAN BUREN BOULEVARD <br /> BETWEEN AUDREY AVENUE AND JACKSON STREET — WORK ORDER NO. <br /> 1403056 <br /> ISSUE: <br /> The issue for Board of Public Utilities consideration is approval of the estimated capital expenditures of <br /> $112,400 for Work Order No. 1403056 for the relocation of six electric utility poles for the Van Buren <br /> Boulevard Street Widening Project. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of $112,400 for Work Order <br /> No. 1403056 to relocate six electric utility poles for Public Work's Van Buren Boulevard Street Widening <br /> Project. <br /> BACKGROUND: <br /> This project will relocate existing overhead facilities in conflict with the Public Works' Van Buren Boulevard <br /> Street Widening Project along Van Buren Boulevard between Audrey Avenue and Jackson Street <br /> (Attachment 1). The project includes the relocation of six Riverside Public Utility wood poles and <br /> associated underground risers. Staff considered undergrounding the overhead lines as part of this <br /> Project. However, the Project addresses small non-continuous sections of Van Buren Boulevard making <br /> undergrounding the lines cost prohibitive. <br /> Riverside Public Utilities (RPU) staff completed the project engineering with consideration given to the <br /> surrounding aesthetics, while ensuring that such consideration did not impact the cost of construction. The <br /> project schedule is as follows: <br /> Project Schedule <br /> Engineering Performed By: RPU engineering staff <br /> Civil Construction Performed By: Public Works' contractor formal bid <br /> Electrical Work Performed By: RPU field forces <br /> Anticipated Start Date: September 27, 2013 <br /> Anticipated Duration: 3 weeks <br /> Coordination Required With: Public Works' Van Buren Street Improvement Project <br /> Reimbursements: None <br />
The URL can be used to link to this page
Your browser does not support the video tag.