Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2013 BPU
>
08-02-13
>
08-02-2013 BPU RPT 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2015 11:14:05 AM
Creation date
9/21/2015 9:57:51 AM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
08-02-2013 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2013 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y L t s- F <br /> RIVERSIDE PUBLIC UTILITIES <br /> PUBLIC UTILITIES Board Memorandum <br /> BOARD OF PUBLIC UTILITIES DATE: August 2, 2013 <br /> DIRECTOR'S REPORT <br /> ITEM NO: 17 <br /> SUBJECT: MONTHLY POWER SUPPLY REPORT—June 2013 <br /> POWER USAGE <br /> Total load requirements (including losses) during June 2013 were 183,307 MWh and 23,562 MWh of <br /> purchases from the CAISO, of which 159,745 MWh were provided by our resources and other <br /> purchases. The retail customer load for June 2013 (177,845 MWh) was 5.6% lower than the retail <br /> customer load in June 2012 (188,375 MWh)- The actual peak system demand was 528 MW, compared <br /> to actual peak system demand of 416 MW last year. Energy returns were 0 MWh and 4,665 MWh were <br /> attributed to losses (4.72%). Green power supplied approximately 23.97% of our retail energy <br /> requirements. <br /> The City's generation resources were available during the month as follows: <br /> UNIT OPERATION <br /> IPP: IPP units 1 and 2 operated at 58.14% capacity factor for the month. <br /> PVNGS: Palo Verde units 1, 2 and 3 operated at 96.15% capacity factor for the month. <br /> Hoover: 95.55% of RVSD's entitlement was met as compared to WAPA's Master Schedule (dated <br /> 5/14/12). <br /> Clearwater: Clearwater's availability was 100% for the month. <br /> RERC: RERC Station (Units 1,2,3 and 4) availability was 99.34%for the month. <br /> Springs: Springs units 1, 2, 3 and 4 availability was 97.19% for the month. <br /> Salton Sea: The Salton Sea units operated at 80-62% capacity factor for the month. <br /> TRANSMISSION: <br /> Pacific DC: The South to North transmission line is currently derated to 975 MW(ETR 11/01/2013) <br /> and the North to South transmission line is operational at 2,990 MW. <br /> Attached are the charts of daily peaks and the graphical comparison of demand and energy supplied <br /> from each resource for the months of June 2012 and June 2013. <br /> AA <br /> Attachments <br /> cc: Scott C. Barber, City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.