Laserfiche WebLink
W A T E R E N E R G Y 1 [ + i. <br /> RIVERSIDE PUBLIC UTILITIES <br /> L3 19& <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: August 2, 2013 <br /> ITEM NO: 9 <br /> SUBJECT: CONSTRUCTION OF THE WAYFIELD ROAD AND MIDDLETON PLACE WATER <br /> MAIN REPLACEMENT PROJECT—WORK ORDER NO. 1313435 <br /> ISSUE: <br /> The item for Board of Public Utilities consideration is approval of the capital expenditure in the amount <br /> of$669,700 to construct the Wayfield Road and Middleton Place Water Main Replacement Project. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the capital expenditure of $669,700 for Work Order No. <br /> 1313435 which includes all design, construction, paving, contract administration and construction <br /> contingency costs for the Wayfield Road and Middleton Place Water Main Replacement Project. <br /> BACKGROUND: <br /> The construction of the Wayfield Road and Middleton Place Water Main Replacement Project is part of <br /> Riverside Public Utilities' (RPU) on-going water main replacement program to replace old and high <br /> priority leaky mains. The project area consists of an existing 8-inch cast iron water main that was <br /> installed in 1977 and has experienced several leaks. The work will entail the construction of <br /> approximately 1,950 linear feet of 8-inch ductile iron pipe, 6 fire hydrants, 48 service tie-overs. and 4 <br /> system connections. The work identified will be constructed by the Water Division's field forces. <br /> Once the new water pipelines are installed, RPU will be responsible for standard trench repaving per <br /> the Public Works standard. Staff will solicit paving bids for paving the trench area from RPU's Paving <br /> Contractor Panel. A budgetary estimate for the paving work has been included in this authorization. <br /> FISCAL IMPACT: <br /> The total capital expenditure for Work Order No. 1313435 is estimated to be $669,700, as summarized <br /> in the following table: <br /> Description Cost Percent of Total <br /> Design $27,000 4.0% <br /> Construction (City Forces) $372,000 55.5% <br /> Construction Contingency $37,200 5.5% <br /> Paving Budget $203,500 30.5% <br /> Construction Survey/Testing $10,000 1.5% <br /> Contract Management/Inspection (Paving) $20,000 3.0% <br /> Work Order Total $669,700 100% <br />