Laserfiche WebLink
W A T E R E N E R G Y l f F t <br />RIVERSIDE PUBLIC UTILITIES <br />P U B L I C U T I L I T I E S Board Memorandum <br />BOARD OF PUBLIC UTILITIES DATE: July 19, 2013 <br />DIRECTOR'S REPORT <br />ITEM NO: 28 <br />SUBJECT: MONTHLY POWER SUPPLY REPORT — May 2013 <br />POWER USAGE <br />Total load requirements (including losses) during May 2013 were 170,223 MWh and 1,449 MWh of sales <br />to the CAISO, of which 171,672 MWh were provided by our resources and other purchases. The retail <br />customer load for May 2013 (164,871 MWh) was 3.6% higher than the retail customer load in May 2012 <br />(159,189 MWh). The actual peak system demand was 498 MW, compared to actual peak system <br />demand of 422 MW last year. Energy returns were 0 MWh and 5,112 MWh were attributed to losses <br />(4.7 %). Green power supplied approximately 27.5% of our retail energy requirements. <br />The City's generation resources were available during the month as follows: <br />UNIT OPERATION <br />IPP: IPP units 1 and 2 operated at 65.15% capacity factor for the month. <br />PVNGS: Palo Verde units 1, 2 and 3 operated at 98.26% capacity factor for the month. <br />Hoover: 100.43% of RVSD's entitlement was met as compared to WAPA's Master Schedule <br />(dated 5/14/12). <br />Clearwater: Clearwater's availability was 100% for the month. <br />RERC: RERC Station (Units 1,2,3 and 4) availability was 78.29% for the month. <br />Springs: Springs units 1, 2, 3 and 4 availability was 100% for the month. <br />Salton Sea: The Salton Sea units operated at 85.40% capacity factor for the month. <br />TRANSMISSION: <br />Pacific DC: The South to North transmission line is currently derated to 975 MW (ETR 08/31/2013) <br />and the North to South transmission line is operational at 2,990 MW. <br />Attached are the charts of daily peaks and the graphical comparison of demand and energy supplied <br />from each resource for the months of May 2012 and May 2013. <br />AA <br />Attachments <br />cc: Scott C. Barber, City Manager <br />