W AT E R E N E R G Y ! I F E. <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES DATE: July 19, 2013 <br />ITEM NO: 15 <br />SUBJECT: CONSTRUCTION OF THE PARK AVENUE AND GROVE AVENUE WATER MAIN <br />REPLACEMENT PROJECT – WORK ORDER NO. 1308883 <br />ISSUE <br />The item for Board of Public Utilities consideration is approval of the capital expenditure in the amount of <br />$2,150,000 to construct the Park Avenue and Grove Avenue Water Main Replacement Project. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve the capital expenditure of $2,150,000 for Work Order No. <br />1308883 which includes all design, construction, paving, contract administration and construction <br />contingency costs for the Park Avenue and Grove Avenue Water Main Replacement Project. <br />BACKGROUND: <br />The construction of the Park Avenue and Grove Avenue Water Main Replacement Project is part of <br />Riverside Public Utilities' (RPU) on -going water main replacement program to replace old and high <br />priority leaky mains. The replacement project was originally scheduled to occur in the Fiscal Year 2014- <br />15. However, the Public Works Department (PW) is scheduled to pave several streets in the area and <br />this project was shifted in priority to reduce overall costs. The project area consists of existing 4 -inch and <br />6 -inch water mains that were installed between 1928 and 1946 and have experienced several leaks. <br />The work will entail the construction of approximately 7,600 linear feet of 8 -inch ductile iron pipe, 128 <br />service tie - overs, 22 fire hydrants, and 20 system connections. The work identified will be constructed by <br />the Water Division's field forces. <br />Once the new water pipelines are installed, RPU will be responsible for standard trench repaving in <br />accordance with PW's paving standard and based on coordination with PW staff. Staff will solicit paving <br />bids for paving the trench area from RPU's Paving Contractor Panel- A budgetary estimate for the trench <br />resurfacing work has been included in this authorization. The final asphalt pavement improvements will <br />occur as part of PW's upcoming street improvement project. <br />FISCAL IMPACT: <br />The total capital expenditure for Work Order No. 1308883 is estimated to be $2,150,000, as summarized <br />in the following table: <br />Description <br />Cost <br />Percent of Total <br />Design <br />$70,000 <br />3.2% <br />Construction (City Forces) <br />$1,400,000 <br />65.1% <br />Construction Contingency <br />$140,000 <br />6.5% <br />Paving Budget <br />$500,000 <br />23.3% <br />Construction Survey/Testing <br />$10,000 <br />0.5% <br />Contract Management/Inspection (Paving) <br />$30,000 <br />1.4% <br />r— Work Order Total <br />$2,150,000 <br />100% <br />