Home
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2013 BPU
>
07-19-13
>
07-19-2013 BPU RPT 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2015 4:59:43 PM
Creation date
9/18/2015 4:02:13 PM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
07-19-2013 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2013 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y 3 s <br /> : RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: July 19, 2013 <br /> ITEM NO: 9 <br /> SUBJECT: CALIFORNIA BAPTIST UNIVERSITY LANCER PLAZA NORTH DEVELOPMENT - <br /> WORK ORDER NO. 1401064 <br /> ISSUE: <br /> The item for Board of Public Utilities consideration is approval of the capital expenditure in the amount of <br /> $50,560.73 for City-provided construction services associated with the development of California Baptist <br /> University's (CBU) Lancer Plaza North. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve Work Order No. 1401064 in the amount of $50,560.73, which <br /> includes City-provided construction services associated with the development of California Baptist <br /> University's Lancer Plaza North. <br /> BACKGROUND: <br /> On January 8, 2013, the City Council approved a Conditional Use Permit to establish a student services <br /> complex, and the Design Review for the rehabilitation of the Adams Plaza located at 3580 Adams Street. <br /> CBU desires to increase the on-site private domestic water system reliability and therefore, approached <br /> Riverside Public Utilities (RPU) requesting the installation of a second water service along Adams Street. <br /> With this installation, CBU's water system will be served from two locations: the existing 8-inch water <br /> meter along Magnolia Avenue and from the proposed 8-inch water meter along Adams Street. <br /> In order to ensure that RPU protects the water quality provided to its customers, staff will perform all <br /> construction activities related to connections to the existing water system. This requires the installation <br /> of a 12-inch water service with an 8-inch water meter, completion of two system disconnections to <br /> abandon water facilities located on CBU property and abandoning one water service. <br /> On July 1, 2013, CBU paid the required fees and charges as set forth in Water Rules 10 and 11 in the <br /> amount of $70,940.73, of which $50,560.73 is allocated towards the construction related services <br /> provided by RPU. <br /> FISCAL IMPACT: <br /> The total capital expenditure for Work Order No. 1401064 is estimated to be $50,560.73. Sufficient <br /> funds are available in the Public Utilities' Water System Expansion Account No. 6230000-470701. <br /> Prepared by: Todd L. Jorgenson, Interim Public Utilities Assistant General Manager/Water <br /> Approved by: David H. Wright, Public Utilities General Manager <br /> Approved by: Belinda J. Graham, Assistant City Manager <br /> Approved as to form: Gregory P. Priamos, City Attorney <br />
The URL can be used to link to this page
Your browser does not support the video tag.