Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2013 BPU
>
07-19-13
>
07-19-2013 BPU RPT 08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2015 4:59:24 PM
Creation date
9/18/2015 4:01:58 PM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
07-19-2013 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2013 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A Y <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: July 19, 2013 <br /> ITEM NO: 8 <br /> SUBJECT: CONSTRUCTION OF THE DAWES STREET WATER MAIN REPLACEMENT <br /> PROJECT—WORK ORDER NO. 1328178 <br /> ISSUE: <br /> The item for Board of Public Utilities consideration is approval of the capital expenditure in the amount <br /> of$122,000 to construct the Dawes Street Water Main Replacement Project. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the capital expenditure of $122,000 for Work Order No. <br /> 1328178 which includes all design, construction, paving, contract administration and construction <br /> contingency costs for the Dawes Street Water Main Replacement Project. <br /> BACKGROUND: <br /> As part of the Dawes Street Improvement Project, the Public Works Department will be lowering the <br /> grade in Dawes Street by one foot over a 300 foot section. The existing water pipeline will have <br /> insufficient cover as a result. The work will entail the construction of approximately 350 linear feet of 8- <br /> inch ductile iron pipe, 13 service tie-overs, 1 fire hydrant, abandonment of a 4-inch waterline, and 2 <br /> system connections. Work will be constructed by the Water Division's field forces. <br /> Permanent paving of the trench and street area will be done as part of the Public Works street <br /> improvement project. A budgetary estimate for base paving the trench has been included in this <br /> authorization in case Public Works is delayed in doing the street work. <br /> FISCAL IMPACT: <br /> The total capital expenditure for Work Order No. 1328178 is estimated to be $122,000, as summarized <br /> in the following table: <br /> Description Cost Percent of Total <br /> Design $5,000 4.1% <br /> Construction (City Forces) $96,000 78.7% <br /> Construction Contingency $9,600 7.9% <br /> Paving Budget $7,000 5.7% <br /> Construction Survey/Testing $2,400 2.0% <br /> Contract Management/Inspection (Paving) $2,000 1.6% <br /> Work Order Total $122,000 100% <br />
The URL can be used to link to this page
Your browser does not support the video tag.