POWER USAGE <br />The City's generation resources were available during the month as follows: <br />UNIT OPERATION <br />IPP: IPP units 1 and 2 operated at 49.77% capacity factor for the month. <br />PVNGS: Palo Verde units 1, 2 and 3 operated at 97.38% capacity factor for the month, <br />SONGS: Both SONGS units 2 and 3 operated at 0% capacity factor for the month, <br />Hoover: 98.68% of RVSD's entitlement was met as compared to AP 's Master Schedule (dated <br />5/14/12). <br />Clearwater: Clearwater's availability was 75.60% for the month. <br />RERC'. RERC Station (Units 1,2,3 and 4) availability was 90,93% for the month, <br />Springs: Springs units 1, 2, 3 and 4 availability was 29.84% for the month. <br />Salton Sea: The Salton Sea units operated at 5.16% capacity factor for the month. <br />TRANSMISSION: <br />Pacific DC: The South to North transmission line is currently derated to 975 MW (ETR 04/30/2013) <br />and the North to South transmission line is operational at 2,990 MW. <br />Attached are the charts of daily peaks and the graphical comparison of demand and energy supplied <br />from each resource for the months of March 2012 and March 2013. <br />AA <br />Attachments <br />ca: Scoff C. Barber, City Manager <br />