W A T E R I E N E R G Y I L I F E <br />RIVERSIDE PUBLIC UTILITIES <br />WI& Board Memorandum <br />P U H I I C U I I I 1 I I F 5 <br />BOARD OF PUBLIC UTILITIES DATE: May 3, 2013 <br />ITEM NO: 7 <br />SUBJECT: CONSTRUCTION OF VICTORIA AVENUE VALVE REPLACEMENT PROJECT — <br />WORK ORDER NO. 1324155 <br />ISSUE: <br />The item for Board of Public Utilities consideration is approval of the capital expenditure in the amount <br />of $405,000 to construct the Victoria Avenue Valve Replacement Project. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve the capital expenditure of $405,000 for Work Order No. <br />1324155, which includes all design, construction, contract administration, inspection and construction <br />contingency costs for the Victoria Avenue Valve Replacement Project. <br />BACKGROUND: <br />The Riverside Public Utilities Department (RPU) uses transmission mains to move water efficiently <br />throughout the service area. Recently, staff identified three valves on a 24 -inch transmission main in <br />the 1200 zone that are inoperable and need to be replaced. One of these valves is partially closed and <br />it impacts staff's ability to operate the system efficiently and effectively. <br />The work will generally entail removal of three 20 -inch valves, installation of three new 24 -inch valves, <br />along with all other related fittings and appurtenances at various locations along Victoria Avenue <br />(Attachment 1). The system shutdowns needed for this work will be carefully scheduled and <br />coordinated by staff to minimize disruptions to the system. Staff will utilize RPU's Contractor's Panel to <br />expedite the project. <br />FISCAL IMPACT: <br />The total capital expenditure for Work Order No. 1324155 is estimated to be $405,000, as summarized <br />in the following table: <br />Description <br />Cost <br />Percent of Total <br />Design <br />$15,000 <br />3.7% <br />Construction <br />$300,000 <br />74.1% <br />Construction Contingency <br />$30,000 <br />7.4% <br />City Forces <br />$25,000 <br />6.2% <br />Construction Survey /Testing <br />$5,000 <br />1.2% <br />Contract Management/Inspection <br />$30,000 <br />7.4% <br />Work Order Total <br />$405,000 <br />100.0% <br />