Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2015 BPU
>
08-07-15
>
08-07-2015 BPU RPT 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2015 12:31:14 PM
Creation date
9/15/2015 11:19:38 AM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
08-07-2015 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2015 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
sY A I R E N E R L Y I I F F <br />J- RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES DATE: AUGUST 7, 2015 <br />ITEM NO: 13 <br />File ID — 15 -2462 — D <br />SUBJECT: CONSTRUCTION OF THE DWIGHT AVENUE WATER MAIN REPLACEMENT <br />PROJECT — WORK ORDER NO. 1511174 FOR $1,930,000 <br />ISSUE: <br />The issue for Board of Public Utilities consideration is to approve a capital expenditure in the amount of <br />$1,930,000 for Work Order No. 1511174 to construct the Dwight Avenue Water Main Replacement <br />Project. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve a capital expenditure of $1,930,000 for Work Order No. <br />1511174, which includes all design, construction, paving, contract administration, inspection and <br />construction contingency costs for the Dwight Avenue Water Main Replacement Project. <br />BACKGROUND: <br />The construction of the Dwight Avenue Water Main Replacement Project is part of Riverside Public <br />Utilities' (RPU) ongoing water main replacement program to replace old and high priority leaky mains. <br />The project area consists of existing 4 -inch, 6 -inch and 8 -inch cast iron and steel water mains that were <br />installed between 1927 and 1951 and have required numerous repairs due to leaks over the past <br />several years. Based on their leak history, age and size, these water pipelines have been identified as <br />high priorities for replacement to increase system reliability and increase fire flow. <br />The work will generally entail the construction of approximately 4,575 linear feet of 8 -inch, 1,200 linear <br />feet of 12 -inch and 100 linear feet of 6 -inch ductile iron pipe, 17 fire hydrants, 132 service tie - overs, and <br />15 system connections, along with all necessary fittings and appurtenances. <br />The work identified will be constructed by the Water Division's field forces. Other than routine service <br />tie - overs, this project is not expected to disrupt service to RPU water customers. <br />Once the new water pipelines are installed, RPU will be responsible for standard trench repaving per <br />the Public Works Department (PW) standards. Staff will solicit paving bids for resurfacing the trench <br />area from RPU's Paving Contractor Panel. A budgetary estimate for the paving work has been <br />included in this authorization. <br />Staff has coordinated with PW regarding the allowable working hours for the project. Most of the work <br />will occur during normal daytime working hours. However, the work occurring within University Avenue <br />will occur at nighttime to minimize disruptions to motorists during peak travel times along this major <br />arterial roadway. <br />
The URL can be used to link to this page
Your browser does not support the video tag.