sY A I R E N E R L Y I I F F <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES DATE: AUGUST 7, 2015 <br />ITEM NO: 12 <br />File ID — 15 -2461 - D <br />SUBJECT: CONSTRUCTION OF THE VALVERDA WATER MAIN REPLACEMENT PROJECT — <br />WORK ORDER NO. 1503563 FOR $1,727,000 <br />ISSUE: <br />The issue for Board of Public Utilities consideration is to approve a capital expenditure in the amount of <br />$1,727,000 for Work Order No. 1503563 to construct the Valverda Water Main Replacement Project. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve a capital expenditure of $1,727,000 for Work Order No. <br />1503563, which includes all design, construction, paving, contract administration, inspection and <br />construction contingency costs for the Valverda Water Main Replacement Project. <br />BACKGROUND: <br />The construction of the Valverda Water Main Replacement Project is part of Riverside Public Utilities' <br />(RPU) ongoing water main replacement program to replace old and high priority leaky mains. The <br />project area consists of existing 2 -inch, 3 -inch, 4 -inch and 6 -inch steel and asbestos cement water mains <br />that were installed between 1944 and 1959, and have required numerous repairs due to leaks over the <br />past several years. Based on their leak history and size, these water pipelines have been identified as <br />high priorities for replacement to increase system reliability and increase fire flow. <br />The work will generally entail the construction of approximately 5,500 linear feet of 8 -inch and 250 linear <br />feet of 4 -inch ductile iron pipe, 14 fire hydrants, 107 service tie -overs and eight system connections, <br />along with all necessary fittings and appurtenances. The new water facilities will be installed according <br />to RPU's current standards, and certain sections of old pipelines crossing private property will be <br />abandoned. The existing water customers along Quiet Lane are currently served by a 4 -inch water <br />pipeline in the rear alley. The water services for these customers will be switched to the front side of the <br />homes, according to RPU's current standards. <br />The work identified will be constructed by the Water Division's field forces. Other than routine service tie - <br />overs, this project is not expected to disrupt service to RPU water customers. <br />Once the new water pipelines are installed, RPU will be responsible for standard trench repaving per the <br />Public Works Department (PW) standards. Staff will solicit paving bids for resurfacing the trench area <br />from RPU's Paving Contractor Panel. A budgetary estimate for the paving work has been included in <br />this authorization. <br />