Laserfiche WebLink
P U B L I C U T I L I T I E S <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIES <br />DATE: SEPTEMBER 18, 2015 <br />ITEM NO: 5 <br />File ID — 15 -2969 — D <br />SUBJECT: PLAZA SUBSTATION 4 kV TO 12 kV CONVERSION CIRCUIT 452 — WORK ORDER <br />NO. 1521820 FOR $1,446,000 <br />ISSUE: <br />The issue for Board of Public Utilities consideration is approval of the capital expenditure of $1,446,000 <br />for Work Order No. 1521820 for the Plaza Substation 4 kV to 12 kV Conversion Circuit 452. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve the estimated capital expenditure of $1,446,000 for Work Order <br />No.1521820 for the Plaza Substation 4 kV to 12 kV Conversion Circuit 452. <br />BACKGROUND: <br />The Electric System Master Plan (ESMP) recommends the conversion of all remaining 4 kV to 12 kV <br />distribution circuits to improve system capacity and reliability. This work will upgrade electric distribution <br />facilities west of Brockton Avenue in the region between Rubidoux Avenue and Cliffside Drive. The <br />scope of work includes the conversion of Plaza Substation Circuit 452 from 4 kV to 12 kV. <br />The overhead work includes replacement of 56 wood poles, 30 transformers, six pole switches, 40 circuit <br />feet of primary overhead wires, 9,514 circuit feet of secondary cables and related overhead distribution <br />facilities. <br />Riverside Public Utilities (RPU) engineering staff performed the design to eliminate any negative visual <br />impacts to the project and surrounding area, with sensitivity to the existing neighborhood, and within City <br />Planning guidelines for the designated area of the project. <br />The project breakdown is proposed as follows: <br />Project Breakdown <br />Engineering Performed By: <br />RPU engineering staff <br />Civil Construction Performed By: <br />None <br />Electrical Work Performed By: <br />RPU field forces <br />Anticipated Start Date: <br />September 21, 2015 <br />Anticipated Duration: <br />41 Weeks <br />Coordination Required With: <br />RPU Field Superintendent <br />Reimbursements: <br />None <br />FISCAL IMPACT: <br />The capital expenditure for Work Order No. 1521820 is estimated to be $1,446,000 as summarized in the <br />following table: <br />