Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2015 BPU
>
09-18-15
>
09-18-2015 BPU RPT 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2015 2:59:50 PM
Creation date
9/8/2015 5:45:28 PM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
09-18-2015 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2015 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
LIEta <br />CITY OF <br />RIVERSIDE <br />P U B L I C U T I L I T I E S <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIES <br />DATE: SEPTEMBER 18, 2015 <br />ITEM NO: 3 <br />File ID - 15 -2966 - C <br />SUBJECT: INSTALLATION OF PAD - MOUNTED SWITCH ON TYLER STREET NEAR DIANA <br />AVENUE— WORK ORDER NO. 1523107 FOR $332,000 <br />ISSUE: <br />The issue for Board of Public Utilities consideration is approval of the capital expenditure of $332,000 for <br />Work Order No. 1523107 for the installation of a pad- mounted switch on Tyler Street near Diana Avenue. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve the estimated capital expenditure of $332,000 for Work Order <br />No. 1523107 for the installation of a replacement pad- mounted switch on Tyler Street near Diana <br />Avenue. <br />BACKGROUND: <br />The Electric System Master Plan (ESMP) recommended replacing outdated underground switches with <br />new pad- mounted equipment to increase system reliability, safety and operational efficiency. The scope <br />of work includes the installation of approximately 126 trench feet of conduit, 850 circuit feet of <br />underground primary cable, one pad- mounted switch, one pad- mounted junction cabinet, one buried <br />transformer enclosure and related electrical facilities. The scope of work also includes the removal of <br />one underground switch and related facilities inside an existing underground vault. <br />Riverside Public Utilities (RPU) engineering staff performed the design to eliminate any negative visual <br />impacts to the project and surrounding area, with sensitivity to the existing neighborhood, and within City <br />Planning guidelines for the designated area of the project. <br />The project breakdown is proposed as follows: <br />Project Breakdown <br />Engineering Performed By: <br />RPU engineering staff <br />Civil Construction Performed By: <br />RPU Contractors Panel <br />Electrical Work Performed By: <br />RPU field forces <br />Anticipated Start Date: <br />October 5, 2015 <br />Anticipated Duration: <br />2 weeks <br />Coordination Required With: <br />PW Inspector, RPU Field Superintendent <br />Reimbursements: <br />None <br />
The URL can be used to link to this page
Your browser does not support the video tag.