,. A F F R <br />E N E R G Y L I F E <br />RIVERSIDE PUBLIC UTILITIES <br />lad Board Memorandum <br />PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES <br />DATE: OCTOBER 3, 2014 <br />ITEM NO: 8 <br />SUBJECT: CIRCUIT 1219 FEEDER LOOP PROJECT — WORK ORDER NO. 1420551 <br />ISSUE: <br />The item for Board of Public Utilities consideration is approval of the capital expenditure of $692,965 for <br />Work Order No.1420551 for Circuit 1219 Feeder Loop Project. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve the estimated capital expenditure of $692,965 for Work Order <br />No. 1420551 for the Circuit 1219 Feeder Loop Project. <br />BACKGROUND: <br />The existing feeder route for Circuit 1219 is located on the eastern city limits and next to the Sycamore <br />Canyon Wilderness Park. Circuit 1219 load is served by a long radial feeder with limited options to <br />support emergency relief when outages occur. The Electric System Master Plan (ESMP) recommends <br />installing a feeder loop on Circuit 1219 to enhance reliability and operability of the system. The project <br />includes the installation of approximately 205 trench feet of conduit, four underground structures, two <br />pad- mounted switches and related electric facilities. <br />Riverside Public Utilities (RPU) engineering staff performed the design to eliminate any negative visual <br />impacts to the project and surrounding area, with sensitivity of the existing neighborhood and within city <br />Planning guidelines for the designated area for the project. <br />Project Breakdown <br />Engineering Performed By: <br />RPU engineering staff <br />Civil Construction Performed By: <br />Energy Delivery Contractor's Panel <br />Electrical Work Performed By: <br />RPU field forces <br />Anticipated Start Date: <br />October 6, 2014 <br />Anticipated Duration: <br />10 weeks <br />Coordination Required With: <br />Public Works Inspector <br />Reimbursements: <br />None <br />FISCAL IMPACT: <br />The capital expenditure for Work Order No. 1420551 is estimated to be $692,965 as summarized in the <br />following table: <br />