Laserfiche WebLink
sY A I R E N E R L Y I I F F <br />== RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES DATE: JULY 10, 2015 <br />ITEM NO: 7 <br />File ID — 15 -2154 - C <br />SUBJECT: SINGLE FAMILY RESIDENTIAL DEVELOPMENT TRACT 30473 — WORK ORDER NO. <br />1325128 FOR $52,492 (LA SIERRA AVENUE AND ORCHARD VIEW LANE) <br />ISSUE: <br />The issue for Board of Public Utilities consideration is to approve a capital expenditure in the amount of <br />$52,492 for Work Order No. 1325128 which includes City - provided construction and inspection services <br />associated with Tract 30473, a single - family residential development in the County of Riverside east of <br />La Sierra Avenue and South of Orchard View Lane. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve the capital expenditure of $52,492 for Work Order No. 1325128 <br />which includes City - provided construction and inspection services associated with Tract 30473, a single - <br />family residential development. <br />BACKGROUND: <br />On January 11, 2005 the County of Riverside Board of Supervisors approved Tentative Tract Map 30473 <br />and the development of approximately 32 single - family residential lots located along La Sierra Avenue <br />south of McAllister Parkway within the unincorporated limits of the County of Riverside. Although the <br />development is located outside city limits, the development is located within Riverside Public Utilities <br />(RPU) Water Division service boundary. RPU has sufficient existing water infrastructure to serve this <br />development. <br />In order to support and sustain water demands for the proposed development project, the developer <br />obtained approval from the RPU to construct a potable water system. The developer hired a Registered <br />Civil Engineer to prepare a water plan in conformance with the RPU's Standard Plans and Specifications. <br />Staff anticipates the water plan to be approved in July 2015. <br />Staff will perform all construction activities related to system connections to the existing potable water <br />system. RPU construction services consist of installing two 8 -inch system connections and two fire <br />hydrants along La Sierra Avenue. RPU will also provide inspection services for the 8 -inch and 4 -inch <br />waterlines constructed by the developer's licensed contractor. <br />On June 10, 2015 the developer paid the required fees and charges as set forth in Water Rules 10 and <br />11 in the amount of $355,217.36, of which $52,492 is allocated towards the construction and inspection <br />related services provided by RPU. <br />FISCAL IMPACT: <br />The total capital expenditure for Work Order No. 1325128 is estimated to be $52,492. Sufficient funds <br />are available in the Public Utilities' Water System Expansion Account No. 6230000 - 470701 and are fully <br />paid for by the developer of the project. <br />