Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2014 BPU
>
09-19-14
>
09-19-2014 BPU RPT 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2015 4:02:26 PM
Creation date
7/1/2015 4:57:18 PM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
09-19-2014 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2014 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y L[ <br />RIVERSIDE PUBLIC UTILITIES <br />^A <br />Board Memorandum <br />PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES DATE: SEPTEMBER 19, 2014 <br />ITEM NO: 7 <br />SUBJECT: MAGNOLIA 4 KV TO 12 KV CONVERSION OVERHEAD PROJECT — WORK <br />ORDER NO. 1319390 <br />ISSUE: <br />The item for Board of Public Utilities consideration is approval of a capital expenditure in the amount of <br />$1,577,100 for Work Order No. 1319390 for the Magnolia 4 kV to 12 kV Conversion Overhead Project. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve the estimated capital expenditure of $1,577,100 for Work Order <br />No. 1319390 for the Magnolia 4 kV to 12 kV Conversion Overhead Project. <br />BACKGROUND: <br />The Electric System Master Plan (ESMP) recommends the conversion of all remaining 4 kV to 12 kV <br />distribution to improve system capacity and reliability. The work includes the conversion of three 4 kV <br />circuits to 12 kV, which involves the replacement of 47 poles, 75 transformers, wires and related <br />overhead distribution facilities. <br />Riverside Public Utilities (RPU) engineering staff performed the design to eliminate any negative visual <br />impacts to the project and surrounding area; with sensitivity of the existing neighborhood; and within City <br />Planning guidelines for the designated area of the project. <br />The project breakdown is proposed as follows: <br />Project Breakdown: <br />Engineering Performed By: <br />RPU engineering staff <br />Civil Construction Performed By: <br />None <br />Electrical Work Performed By: <br />RPU field forces <br />Anticipated Start Date: <br />October 1, 2014 <br />Anticipated Duration: <br />16 weeks <br />Coordination Required With: <br />RPU Field Superintendent <br />Reimbursements: <br />None <br />FISCAL IMPACT: <br />The capital expenditure for Work Order No. 1319390 is estimated to be $1,577,100 as summarized in the <br />following table: <br />
The URL can be used to link to this page
Your browser does not support the video tag.