Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2014 BPU
>
09-05-14
>
09-05-2014 BPU RPT 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 6:24:27 PM
Creation date
7/1/2015 4:45:22 PM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
09-05-2014 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2014 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y t F F t <br />RIVERSIDE PUBLIC UTILITIES <br />PUBLIC UTILITIES Board Memorandum <br />BOARD OF PUBLIC UTILITIES DATE: September 5, 2014 <br />DIRECTOR'S REPORT <br />ITEM NO: 19 <br />SUBJECT: MONTHLY POWER SUPPLY REPORT — July 2014 <br />Power Usage: <br />Wholesale Load (Vista): — <br />Peak Demand: — <br />RVSD Energy Mix (Table 1): <br />Resource <br />243,795 MWH (Table 1) <br />544 MW of which 432 MW comes from RVSD available resources (Table 2) <br />MWH <br />a) Nuclear <br />9,480 <br />b) Coal <br />90,830 <br />c) Large Hydroelectric <br />3,023 <br />d) Natural Gas <br />6,154 <br />e) Renewables <br />28,508 <br />f) Other (BPA) <br />7,920 <br />g) Inter SC Trades <br />48,692 <br />h) Green Inter SC Trades <br />- <br />i) CAISO Purchases <br />49,188 <br />Total: <br />243,795 <br />Total Green Power Supply — <br />28,508 MWH which yields 11.69% of the Total Wholesale Load Requirement <br />Resource Availability: <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 98.01 % capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 89.11 % capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 23 MW, with energy entitlement of 3,023 MWH <br />Natural Gas: Clearwater's availability was 92.20% for the month. <br />RERC Units 1, 2, 3 and 4 availability was 99.45% for the month. <br />Springs Units 1, 2, 3 and 4 availability was 100% for the month. <br />Renewable: Salton Sea units operated at 74.67% capacity factor for the month. <br />Wintec operated at 53.73% capacity factor. <br />WKN operated at 54.33% capacity factor. <br />The attached graphical comparisons represents RPU's July: <br />Table 1: Total Energy Requirements /Resource Mix <br />Table 2: Peak Hour Total Capacity <br />Table 3: Retail Customer Load <br />Table 4: Daily Peak Load and Temperature Comparisons <br />AA <br />Attachments <br />cc: Scott C. Barber, City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.