Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2014 BPU
>
08-01-14
>
08-01-2014 BPU RPT 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 6:50:50 PM
Creation date
6/8/2015 10:40:20 AM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
08-01-2014 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2014 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
BOARD OF PUBLIC UTILITIES DATE: August 1, 2014 <br />DIRECTOR'S REPORT <br />ITEM NO: 15 <br />SUBJECT: MONTHLY POWER SUPPLY REPORT — June 2014 <br />Pgw q Usa __, <br />-�- -qf <br />Wholesale Load (Vista), <br />Peak Demand: <br />,R1 <br />Resourc;e <br />203,655 MWH (Table 1) <br />45.9 MW of which 360 MV V comes -from RV SD available -resources (Table 2) <br />MWH <br />a) Nuciear <br />9,048 <br />b) Coal <br />76,512 <br />c') Large Hydroeleiatidc <br />3,113 <br />d) Natural Gas <br />1,127 <br />e) Renewables <br />33,024 <br />�1 Other (BPA) <br />28,725 <br />g) Inter SC Trades <br />40,200 <br />h) Green Inte., SC Trades <br />- <br />il) CA ISO Purchases <br />it <br />Total-, <br />203,655 <br />Toll.W G-ceen F`,ovvsi �Supq-:iN,, — <br />33,024 Rj!V,,!H which yieids 16.22% of the Total Wholesale Load Requirement <br />ReSOUrce .Availability: <br />Nuclear: Palo Verde units 1, <br />2 and 3 operated at 96.67 % capacity factor ',or the month, <br />Coal: IPP units I and 2 operated at -117.57% capacity, factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 21 V1W, with energ am r f 3,1 8 MWH <br />4 _y entitle e ft o 8 <br />Natural Gas: Clearwater's avallabiRy was 100% for the month, <br />RER C Units 1, 2, 3 and 4 availability was 100% for the month. <br />Springs Units 1, 2, 3 and 4 availability was 98.75% for the month.. <br />Renewable: Salton Sea units operated at 89,44% capacity factor for the month. <br />Wintec operated at 64.29% capacity factor, <br />WKN operated at 64.61 % capacity factor. <br />The attached graphical compansons represents RPU's June: <br />"lab " =. e 1: Total Energy Requirern, ents/Resource Mix <br />('able 2; Peak Hour Total Capacity <br />Table 3- Retail Customer Load <br />Table 4: Daily Peak Load and Temperature Comparisons <br />AA <br />Attachments <br />= Scott C. Barber, City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.