Laserfiche WebLink
Power-Usaae: <br />Wholesale Load (Vista): <br />Peak Demand: <br />RVSD En Mix e <br />Resource <br />a) <br />Nuclear <br />b) <br />Coal <br />c) <br />Large Hydroelectric <br />d) <br />Natural Gas <br />e) <br />Renewables <br />f) <br />Other (BPA) <br />g) <br />Inter SC Trades <br />11 <br />Green Inter SC Trades <br />CAI SO Purchases <br />W <br />Mahaff", <br />M11 11 -W <br />197,340 MWH (Table 1) <br />490 MW of which 411 MW comes from RVSD ava0able resources {fable 2) <br />8,590 <br />73,900 <br />3,606 <br />7,477 <br />21,184 <br />28,536 <br />14,960 <br />39,087 <br />Total` 197,340 <br />Totn,� <br />21-184 MVVH which yields '10.73% of the Total Wholesale Load <br />Requirement <br />Resource Availabifty: <br />Nuclear-. Palo Verde units "1, 2 and 3 operated at 88.81 % capacity factor for the month. <br />Coal: IPP units I and 2 operated at 72,50% capacity factor for the month. <br />Large Hydro: Hoover, VSD's capacity entitlement was 18 MW, with energy entitlement of 3,543 MWH. <br />Natural Gas: Clearwater's availability was 99.33% for the month, <br />RERC Units 1, 2, 3 and 4 availability was 98.30% for the month. <br />Springs Units 1, 2, 3 and 4 availability was 100% for the month. <br />Renewable: Salton Sea units operated at 52.29% capacity factor for the month. <br />Wintec operated at 56 82% capacity factor. <br />WKN operated at 6 11 .13 %a capacity factor. <br />The attached graphical comparisons represents RPU's May: <br />Table 1: Total Energy Requirements/Resource Mix <br />Table 2: Peak Hour Total Capacity <br />Table 3: Retail Customer Load <br />Table 4: Daily Peak Load and Temperature- Comparisons <br />AA <br />Attachments <br />cc: Scott C. Barber, City Manager <br />