Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2014 BPU
>
07-18-14
>
07-18-2014 BPU RPT 05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 7:14:11 PM
Creation date
6/4/2015 4:24:16 PM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
07-18-2014 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2014 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
The item for Board of Public Utilities consideration is approval of a bid award for the roof replacement at <br />two Riverside Public Utilities (RPU) facilities, Gateway building at 3435 14th Street and the Utility <br />Operations Center (LIOC) Building B, located at 2911 Adams Street. <br />That the Board of Public Utilities award a contract to C.I. Services, Inc., of Mission Viejo, California, for <br />the roof replacement at the Gateway building at 3435 14th Street and the Utility Operations Center <br />Building B, located at 2911 Adams Street in the amount of $208,000 <br />The Gateway facility is OCCUpied by the Power Resources Division which is a 24/7 operation, The <br />building was remodeled and the current roof was installed in 1994. The IJOC Building B has transition <br />from strictly a warehouse building to a combination warehouse/office facility. The current roof was <br />installed in 1996. Over the years, numerous repairs have been performed on significant roof leaks and <br />other structural problems at both facilities. <br />Several roofing contractors as well as City Building Services Division staff have inspected both facilities <br />and have recommended removal and replacement of the roofing systems. <br />A comprehensive bid package was issued in May 2014 and seven contractors bid on the project. The <br />lowest responsive bid was submitted by C.1, Services, Inc. Staff has reviewed all provided <br />documentation and has determined that C.1, Services, Inc. has met all of the requirements of the <br />specifications. The seven bids received are summarized below: <br />— — — — — — — ----- --- --- — — — — <br />COMPANY <br />I i C.I. Services, Inc. 1 Mission V! . c-, California 208,000 <br />2 1 Roy 0. Huffman Riverside, California $246, 347 <br />-- — ------ — ------ �-! ...... I — ------ — ------ — ------ — ------ — ------ — ------ <br />3 1 Letner RoofinCo <br />. 0rapq , it qrn I <br />a $24,90P . <br />1 4 1 Chapman Coast Roof Inc. Fullerton, California $253,037 <br />5 Tech -America So. Cal Inc. i Santa Ana, Califorma 1 � ,740 <br />6 BEST Cqq!E� Services. Inc. Gardena, California $355,850 <br />Fresno, California <br />Brazos Urethane Inc. $371,200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.