Laserfiche WebLink
BOARD OF PUBLIC UTILITIES DATE: May 2, 20,14 <br />DIRECTOR'S REPORT <br />ITEM NO: 16 <br />Power L.sa. e: <br />Wholesale Load (Vista): <br />Peak Demand: <br />RVSQ EDergy Wx f'Cqblp _1 1: <br />Resource <br />a) Nudear <br />b) Coal <br />c) Large Hydroelectric <br />d) Natural Gas <br />e) Renewables <br />f) Other (Pry) <br />g) Inter SC Trades <br />h) Green Inter SC Trades <br />i) CAISO Purchases <br />67,738 tAWH (Table 1 <br />287 MW of which 338 MW met by RVSD resources (Table 2) <br />9,176 <br />56,492 <br />3,918 <br />1,975 <br />1,912 <br />1,890 <br />65,230 <br />27,145 <br />Total. 167,738 <br />"Q`tai G';- en' Pnw'.,;- - uppiy which yields I '! 4% of the Total Wholesale Load Requirenlent <br />Resource AvailgtaftlL <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 94.87% capacity factor for the mointh. <br />Coal: IPP units I and 2 operated at 55.42% capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlernent was 21 MW, with energy entitlement of 3,933 MWK <br />Natural Gas: Clearwater's availability was 3.83% for the month, <br />RERC Station (Units 1,2,3 and 4) availability was 99,87% for the month, <br />Springs units 1, 2, 3 and 4 availability was 100% for the month. <br />Renewable, Salton Sea units operated at 0% capacity factor for the month, <br />Wintec operated at 38.69% energy factor-. <br />WKN operated at 34,32% energy factor. <br />The attached graphical comparisons represents RPU's March: <br />Table 1: Total Energy Requirements/Resource Mix <br />Table 2: Total Peak Hour Capacity <br />Table 3: Retail Customer Load <br />Table 4: Daily Peak Load and Temperature Comparisons <br />AA <br />Attachrrgents <br />cc: Scott C. Barber, City Manager <br />