Laserfiche WebLink
The issue for the Board of Public Utilities consideration is approval of a Professional Consulting Services <br />Agreement with Kestrel Power Engineering, LLC in an amount of $56,250 for generating facility testing, <br />modeling and model validation. <br />That the Board of Public Utilities: <br />1. Approve a Professional Consulting Services Agreement with Kestrel Power Engineering, LLC, of <br />Fairbury, Illinois, in an a mount of $56,250 for the generating facility testing, modeling and model <br />validation for Riverside Energy Resources (".enter generator Units 1 and 2 and Springs generator <br />Units 1-4; and <br />2. Authorize the City Manager, or his designee, to execute the Agreement. <br />BACKGROUND: <br />North American Electric Reliability Corporation (NERC) Reliability Standards specify modeling data <br />reqUiremeats and reporting procedures for all power system studies, Accurate models of generators and <br />associated controls are necessary for realistic simulations of the western interconnection electric power <br />system. Tests are required at least once every five years and must occur while the units are operating to <br />validate appropriate equipment characteristics. <br />The Riverside Energy Resources Center (RE RC) generator Units 1 and 2, and Springs generator Units <br />1-4 r- last tested in 2009 and are due for retesting. The test data must be made available to Southern <br />California Edison for submittal no later than August 6, 2014. Testing of RE RC Units 3 and 4 is not, <br />required at this time. <br />Staff issued a Request for Proposals (RFP) requesting consulting and service proposals from qualified <br />vendors. Three proposals were received with Kestrel Power Engineering the lowest responsive and <br />responsible bidder. <br />The table below summarizes the details of the proposals received: <br />--Pr–o—pos–a—l– Contingency (One I <br />Vendor, <br />-n-gin- —eer—in—g, <br />Base Price <br />Extra Field DLaA <br />Total Rank <br />$ 53,500 <br />$2,750 <br />$56,250 1 <br />-L'LC <br />GE 2y______ ............ <br />$62,960 <br />$3,000 <br />s-05,960 2 <br />Power E22j2eers. <br />- <br />ie <br />e— <br />E-r,qineesEstiniate$,000 <br />