Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2014 BPU
>
05-02-14
>
05-02-2014 BPU RPT 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 8:34:34 PM
Creation date
6/2/2015 10:43:03 AM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
05-02-2014 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2014 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
ISSUE:,. <br />The item for Board of Public Utilities consideration is approval for Work Order No. 1418257 in the amount <br />of $93,190.. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />1. Approve the estimated capital expenditure of $93,190 for Work Order No. 1418257; and <br />2. Approve a construction Contract for the bid from VC1 Construction of Upland, California, in an <br />annount of $61;990. 5, <br />On February 25, 2014, a section of 12 kV underground primary Cable failed on Belladonna Road, <br />northerly of Tobira Lane between Buried Transformer Enclosure, (BTE) 4515 and BTE 4516. Electric field <br />crews were unable to remove the underground cable from the existing conduit. Temporary switching <br />was completed in order to maintain service from another source. Therefore, new conduit is required to <br />restore the system to its permanent config u ration. The Project includes the installation of approximately <br />455 trench feet of conduit, underground primary, cable, and related electrical distribution facilities, <br />--------- - -- <br />- ------ - ------ - ------ <br />En i r!,g Performed.py„.. staff . <br />Civil Construction Performed <br />1 ContracA crews from Contractors' Panel <br />RPU field forces <br />I Electrical Work Performed_��_____ <br />Antic ed Start Date,,, I May 12,2014 <br />......... .. <br />Ant of t d Duration- 'Two Wapks <br />------- — ----- <br />Coordination f��quired it None <br />[B�qimbursements None _rt ... ....... - ----- L1_1-__._______ _11_____---_____11-._ <br />The civil construction portion of this project was issued to the Contractors Panel for Energy Delivery <br />Work on March 2 0, 2014. Bids were opened on April 2, 2014 with the following resuft: <br />
The URL can be used to link to this page
Your browser does not support the video tag.