Laserfiche WebLink
BACKGROUND: <br />All construction work including trenching, conduits and other <infr astructure work will be performed by <br />contract crews from the Contractors Panel, All electrical construction work will be performed by RPU <br />field forces. <br />The Project includes: <br />* Installation of 955-feet of conduit; <br />* Installation of a primary pullbox; and <br />* Removal of switch ASF3-266, <br />The civil construction portion of this project was issued to the ontractors Panel for Energy Delivery <br />Work on January 23, 2014. lids mere opened on March 10, 2014 with the following reAults: <br />-i%-- ------ 1--.- 11-1-- 11 -- ------ -- -------- ....... <br />ntr Memactors Panel Eger Location Bid Amount Comments <br />Southern Contracting San Marcos, CA 1 $156 634 70 Low Re� <br />ponsible Bidder------------ <br />I Henkels & McCoy Pomona, CA $161,44500 1 <br />'i VCI Construction 1 Upland, CA $177,892.90 <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />P U1 0 L I C U I L -1 T I E 5 <br />BACKGROUND: <br />All construction work including trenching, conduits and other <infr astructure work will be performed by <br />contract crews from the Contractors Panel, All electrical construction work will be performed by RPU <br />field forces. <br />The Project includes: <br />* Installation of 955-feet of conduit; <br />* Installation of a primary pullbox; and <br />* Removal of switch ASF3-266, <br />The civil construction portion of this project was issued to the ontractors Panel for Energy Delivery <br />Work on January 23, 2014. lids mere opened on March 10, 2014 with the following reAults: <br />-i%-- ------ 1--.- 11-1-- 11 -- ------ -- -------- ....... <br />ntr Memactors Panel Eger Location Bid Amount Comments <br />Southern Contracting San Marcos, CA 1 $156 634 70 Low Re� <br />ponsible Bidder------------ <br />I Henkels & McCoy Pomona, CA $161,44500 1 <br />'i VCI Construction 1 Upland, CA $177,892.90 <br />