Home
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2014 BPU
>
05-02-14
>
05-02-2014 BPU RPT 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 8:35:08 PM
Creation date
6/2/2015 10:42:46 AM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
05-02-2014 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2014 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
BACKGROUND: <br />All construction work including trenching, conduits and other <infr astructure work will be performed by <br />contract crews from the Contractors Panel, All electrical construction work will be performed by RPU <br />field forces. <br />The Project includes: <br />* Installation of 955-feet of conduit; <br />* Installation of a primary pullbox; and <br />* Removal of switch ASF3-266, <br />The civil construction portion of this project was issued to the ontractors Panel for Energy Delivery <br />Work on January 23, 2014. lids mere opened on March 10, 2014 with the following reAults: <br />-i%-- ------ 1--.- 11-1-- 11 -- ------ -- -------- ....... <br />ntr Memactors Panel Eger Location Bid Amount Comments <br />Southern Contracting San Marcos, CA 1 $156 634 70 Low Re� <br />ponsible Bidder------------ <br />I Henkels & McCoy Pomona, CA $161,44500 1 <br />'i VCI Construction 1 Upland, CA $177,892.90 <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />P U1 0 L I C U I L -1 T I E 5 <br />BACKGROUND: <br />All construction work including trenching, conduits and other <infr astructure work will be performed by <br />contract crews from the Contractors Panel, All electrical construction work will be performed by RPU <br />field forces. <br />The Project includes: <br />* Installation of 955-feet of conduit; <br />* Installation of a primary pullbox; and <br />* Removal of switch ASF3-266, <br />The civil construction portion of this project was issued to the ontractors Panel for Energy Delivery <br />Work on January 23, 2014. lids mere opened on March 10, 2014 with the following reAults: <br />-i%-- ------ 1--.- 11-1-- 11 -- ------ -- -------- ....... <br />ntr Memactors Panel Eger Location Bid Amount Comments <br />Southern Contracting San Marcos, CA 1 $156 634 70 Low Re� <br />ponsible Bidder------------ <br />I Henkels & McCoy Pomona, CA $161,44500 1 <br />'i VCI Construction 1 Upland, CA $177,892.90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.